EROSION CONTROL GENERAL NOTES:
<br />EROSION AND SEDIMENT CONTROL
<br />MAINTENANCE PROGRAM:
<br />1. NO LAND DISTURBING ACTIVITY SHALL OCCUR UNTIL A GRADING PERMIT HAS BEEN
<br />CONSTRUCTION ACTIVITIES AND/OR CLIMATIC EVENTS AND TO PROVIDE ADDITIONAL
<br />ISSUED FROM THE CITY OF ORONO AND THE MINNEHAHA CREEK WATERSHED DISTRICT.
<br />BMP'S OVER AND ABOVE THE MINIMUM REQUIREMENTS SHOWN ON THE PLANS, AS MAY
<br />1 INSPECT SILT FENCES IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY
<br />BE NEEDED TO PROVIDE EFFECTIVE PROTECTION OF WATER AND SOIL RESOURCES.
<br />DURING PROLONGED RAINFALL. IMMEDIATELY REPAIR FAILED OR FAILING SILT FENCE.
<br />2. BEST MANAGEMENT PRACTICES (BMP'S) REFER TO EROSION AND SEDIMENT CONTROL
<br />PRACTICES DEFINED IN THE MPCA PROTECTING WATER QUALITY IN URBAN AREAS AND
<br />13. THE BMP'S SHALL BE INSPECTED DAILY BY THE PERMITTEE/CONTRACTOR AND
<br />2. REPLACEMENT/REPAIR - BMP'S SHALL BE SHALL BE REPAIRED, REPLACED OR
<br />THE MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING
<br />MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. SILT FENCES
<br />SUPPLEMENT OF ALL NONFUNCTIONAL BMP'S WITH FUNCTIONAL BMP'S BY THE END OF THE
<br />HANDBOOK.
<br />CLEANED OR REPLACED AT SEDIMENT BUILDUP OF 1/2 OF THE FENCE HEIGHT.
<br />NEXT BUSINESS DAY AFTER DISCOVERY UNLESS ANOTHER TIME FRAME IS SPECIFIED IN
<br />SECTION 11.5 OR 11.6.
<br />3. ALL BMP'S SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE
<br />14. LAND DISTURBING ACTIVITIES SHALL OCCUR IN INCREMENTS OF WORKABLE SIZE
<br />ERO-502
<br />CONDITIONS, AND ESTIMATED DURATION OF USE.
<br />SUCH THAT ADEQUATE BMP CONTROL CAN BE PROVIDED THROUGHOUT ALL PHASES OF
<br />3. SEDIMENT REMOVAL - SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM
<br />CONSTRUCTION. THE SMALLEST PRACTICAL AREA SHALL BE EXPOSED OR OTHERWISE
<br />EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-THIRD THE
<br />4. THE SWPPP MAY BE REVISED AT ANYTIME OF THE PROJECT TIMELINE AS LONG AS
<br />DISTURBED AT ANY ONE TIME.
<br />HEIGHT OF THE BARRIER. ANY SEDIMENT REMAINING IN PLACE AFTER THE SILT FENCE OR
<br />THE EVE'S ARE SELECTED, INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE
<br />FILTER FABRIC IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH EXISTING
<br />MANUFACTURER SPECIFICATION AND ACCEPTED ENGINEERING PRACTICES (SECTION 7 OF
<br />15. OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SOIL SLOPES ON
<br />GRADE, PREPARED, AND SEEDED WITH THE APPROPRIATE SEED MIX, OR SODDED AS DIRECTED
<br />MPCA NPDES PERMIT).
<br />FINAL PASS, LEAVING TRACK GROOVES PERPENDICULAR TO THE SLOPE. DO NOT
<br />BY THE ENGINEER.
<br />BACK -BLADE. LEAVE A SURFACE ROUGH TO MINIMIZE EROSION.
<br />4. REMOVAL OF SILT FENCE - SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED
<br />• ALL SWEEP CHANGES MUST BE DONE BY A QUALIFIED INDIVIDUAL (21.2A OR 21.28
<br />THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPWARD SLOPING AREA HAS BEEN
<br />OF MPCA NPDES PERMIT).
<br />16. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED FROM EROSION
<br />PERMANENTLY STABILIZED. IF THE UPWARD SLOPING AREA IS TO BE EXPOSED LONGER
<br />FOLD UNDER 6"
<br />WITHIN 7 DAYS OF SUBSTANTIAL COMPLETION OF GRADING IN THAT AREA. TEMPORARY
<br />THAN SIX (6) MONTHS, THAT AREA SHALL BE COVERED WITH TEMPORARY VEGETATION
<br />5. A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS
<br />IN PROGRESS.
<br />SEED AND MULCH SHALL COVER ALL EXPOSED SOILS IF GRADING COMPLETION IS
<br />DELAYED LONGER THAN 7 DAYS. PERMANENT SEED AND MULCH OR SOD IS REQUIRED
<br />WHEN FIRST EXPOSED.
<br />BEFUMLOG
<br />WITHIN 3 DAYS OF COMPLETION OF FINAL GRADING.
<br />5. THE CONTRACTOR MUST ROUTINELY INSPECT THE CONSTRUCTION SITE ONCE EVERY SEVEN
<br />6. THE BOUNDARIES OF THE LAND DISTURBANCE LIMITS SHOWN ON THE PLANS SHALL
<br />BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. NO DISTURBANCE
<br />17. GENERAL TEMPORARY SEED SHALL BE MNDOT MIX 22-112 ® 100 LBS. PER ACRE
<br />( ) DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT
<br />7RE
<br />BEYOND THE DISTURBED LIMITS.
<br />OR APPROVED EQUAL. PERMANENT SEED SHALL BE MNDOT MIX 25-151 ® 120 LBS.
<br />GATER THAN 0.5 INCHES IN 24 HOURS. IF EVIDENCE OF EROSION AND SEDIMENT BMP
<br />PER ACRE OR APPROVED EQUAL. (PLANTING DATES PER SPEC 2575) MULCH SHALL
<br />DEPOSITION IS DISCOVERED CONTRACTOR MUST COMPLETE REMOVAL OR STABILIZATION WITHIN
<br />7. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER
<br />BE MNDOT TYPE 1 (CLEAN OAT STRAW) ® 2 TONS PER ACRE AND DISK ANCHORED IN
<br />(7) CALENDER DAYS OF DISCOVERY.
<br />VEGETATIVE COVER TO HELP FILTER RUNOFF.
<br />PLACE OR APPROVED EQUAL. FERTILIZER SHALL BE 80-80-80 NPK PER ACRE
<br />6. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION
<br />(UNLESS P RESTRICTIONS APPLY) AND INCORPORATED INTO THE SEED BED.
<br />MUST BE RECORDED IN WRITING AND THESE RECORDS MUST BE RETAINED WITH THE SWEEP
<br />8.ESTABLISH A PERMANENT VEGETATIVE COVER ON ALL EXPOSED SOILS WHERE LAND S COMING OUT OF AGRICULTURAL PRODUCTION. PLANT AS SOON AS POSSIBLE TO
<br />IS
<br />18. POND, BASIN AND WETLAND AREAS SHALL BE SEEDED IN ACCORDANCE WITH
<br />RECORDS OF EACH INSPECTION AND
<br />ESTABLISH DENSE GRASS FILTER PRIOR TO CONSTRUCTION AND TO MINIMIZE WEED
<br />GROWTH.
<br />LANDSCAPE PLAN.
<br />MAINTENANCE ACTIVITY SHALL INCLUDE:
<br />19, ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY
<br />A. DATE AND TIME OF INSPECTIONS;
<br />9. ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT OPERATE
<br />DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED
<br />B. NAME OF PERSON(S) CONDUCTING INSPECTIONS;
<br />EQUIPMENT WITHIN THE DRIPLINE, ROOT ZONES OR WITHIN TREE PROTECTION FENCE
<br />OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED.
<br />C. FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR
<br />AREAS.
<br />20. AN ALTERNATE EROSION & SEDIMENT CONTROL PLAN SHALL BE REQUIRED FOR
<br />CORRECTIVE ACTIONS;
<br />D. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY
<br />10. ALL EROSION AND SEDIMENT CONTROL FACILITIES (BMP'S) SHALL BE INSTALLED AND
<br />IN OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES AND THEY SHALL BE
<br />LAND DISTURBANCES ON EACH LOT AS PART OF ANY FUTURE BUILDING PERMIT FOR
<br />THE CONSTRUCTION OF STRUCTURES AND DRIVEWAYS.
<br />COMPLETING
<br />SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL
<br />MAINTENANCE ACTIVIES.
<br />FOR EROSION HAS PASSED.
<br />E.DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 1/2
<br />11. SILT FENCE IS REQUIRED AT DOWN GRADIENT PERIMETER OF DISTURBED AREAS AND
<br />DEWATERING:
<br />INCH (0.5 INCHES)
<br />STOCKPILES. PROTECT WETLANDS, WATERCOURSES AND ADJACENT PROPERTIES FROM
<br />IN 24 HOURS:
<br />SEDIMENTATION AND STORMWATER RUNOFF.
<br />1. THE CONTRACTOR SHALL PROVIDE A PLAN TO THE CITY AND PROJECTENGINEER
<br />F. DOCUMENTS OF CHANGES MADE TO THE SWPPP AS REQUIRED IN SECTION 6.
<br />12. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE
<br />FOR REVIEW. THE PLAN AT MINIMUM SHALL BE A DEWATERING PLAN INCLUDING
<br />ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR
<br />WATER ROUTING, STORAGE, AND DISCHARGE LOCATION.
<br />7. WHERE PARTS OF THE CONSTRUCTION SITE HAVE UNDERGONE FINAL STABILIZATION, BUT
<br />SEASONAL CONDITIONS DICTATE, THE PERMITTEE/CONTRACTOR SHALL ANTICIPATE THAT
<br />WORK REMAINS ON OTHER PARTS OF SITE, INSPECTIONS OF THE STABILIZED AREAS MAY BE
<br />MORE BMP'S WILL BE NECESSARY TO ENSURE EROSION AND SEDIMENT CONTROL ON
<br />2. IF ANY TEMPORARY DEWATERING IS REQUIRED ONSITE THE CONTRACTOR SHALL
<br />REDUCED TO ONCE PER MONTH. WHERE WORK HAS BEEN SUSPENDED DUE TO FROZEN
<br />THE SITE. DURING THE COURSE OF CONSTRUCTION, IT IS THE RESPONSIBILITYOF THE
<br />DISPOSE OF STORMWATER OR GROUND WATER BY USE OF PUMPS AND HOSES TO
<br />GROUND CONDITIONS, THE REQUIRED INSPECTIONS AND MAINTENANCE MUST TAKE PLACE AS
<br />PERMITTEE/CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY
<br />ACCEPTABLE DISCHARGE POINTS APPROVED BY THE CITY AND PROJECT ENGINEER.
<br />SOON AS RUNOFF OCCURS AT THE SITE OR PRIOR TO RESUMING CONSTRUCTION, WHICHEVER
<br />COMES FIRST.
<br />ARO ND PERIMETEa NLEL G FN NG TPOST
<br />PLAN VIEW
<br />_-K _MD �1T1cRUEH111T-
<br />ON
<br />KKTE C NTOETaw2H) E T
<br />ry�F�a �AA MPED
<br />T- , SECTION sesnF GUI OM6 GF Mn0oT
<br />INLET PROTECTION T R
<br />HEAVY DUTY SILT FENCE
<br />iSILTYOU`T " BOLTON
<br />�"�FFENCEE &MENK
<br />ERO-101 Real People. Real SduFp
<br />ITS T Ex Ro xw.x �,.RRo xw.x
<br />xwixwnu y( mx[s[rnoxwul
<br />INLET PROTECTION
<br />PERFORATED WALL
<br />ERO-103
<br />NOTE
<br />DITCH CHECK-BIOROLL THE DITCH CHECK AND NOTMOUNDTHE ENDS
<br />BOLTON
<br />& MENK
<br />RealProple Real Salu[lons.
<br />DITCH CHECK ©BOLTOQ"POIINLETPROTECTION
<br />AERO-002-BIOROLL &MENKN AERO -102 GEOTE)ITILE BAG
<br />Real People.RREISduVO
<br />REINFORCE 2' REINFORCE SO'PAST
<br />ELONR N- TOE OF SLOPE
<br />AERIC
<br />NWL= WITH ANCHORAGE
<br />NEN H
<br />SECHON 0
<br />tSEffION
<br />ERGENCY OVERFLOW
<br />V=%XI(.XI[
<br />BERM ELEV=L�A I
<br />L BERM BERM J
<br />REINFP ORTURf
<br />B ORCEMENTMAT
<br />PER PLAN
<br />EROSION CONTROL BLANKET
<br />AT POND EOF
<br />KRR D TiMT
<br />AT 6 Ma%IMUM SPAC NOG S
<br />TE513M IIMUM7 GOO EXTIL1(EEENIFABRIC, 36 WIDE
<br />IC ANCHONAGE TRENCH
<br />.o 1IFECTION OF�RnaFuWIN TAMPED NAruw.LsoL
<br />R
<br />w
<br />MiN XTILEFABRICEHALL
<br />SILT FENCEHEAVY DUTY
<br />NOT TO SCALE
<br />� TDSIHEroFS Ai6 MIRE AKMUMSPAC rvG
<br />PB" GEOTFXTLE FABP436 WIDTH
<br />EIRE -NOF
<br />RUNOFF FLOW
<br />e �o
<br />u�
<br />IPwsFLUE (DEPTH E
<br />fi- PwPI
<br />SILT FENCE - MACHINE SLICED
<br />ROTTOE..
<br />BLANKET AT BOLTON F°NO SILT FENCE
<br />oPOND ELF & MENK
<br />ERO-201 Real F-pk.R Eddionx ,x, ERO-400
<br />BOLTON FON° pxpvurzn NLET PROTECTION
<br />&MENK AERO -104 ROAD DRAIN
<br />Real People. Real SOIUU003.
<br />SEDIMENT CONTROL PRACTICES:
<br />CITY OF ORONO RESOLUTI
<br />PERMANENT COVER:
<br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING
<br />SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS.
<br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT
<br />PERMITERS BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE
<br />PRACTICES SHALL REMAIN IN PLACE UNTIL PERMANENT COVER HAS BEEN
<br />ESTABLISHED.
<br />3. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE
<br />ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR
<br />GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE
<br />COMPLETED ASQUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES MUST
<br />BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT
<br />CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT
<br />EVEN IF THE ACTIVITY IS NOT COMPLETE.
<br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING
<br />CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET
<br />HAVE BEEN STABILIZED,
<br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCES OR OTHER EFFECTIVE
<br />SEDIMENT CONTROLS, AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING
<br />STORM WATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS
<br />AND DITCHES.
<br />6. SITE CONSTRUCTION ENTRANCES WILL BE AS SHOWN ON THE PLAN. ROCK
<br />CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT EACH ENTRANCE.
<br />POLLUTION PREVENTION
<br />MANAGEMENT MEASURES:
<br />THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION
<br />MANAGEMENT MEASURES ON THE SITE:
<br />1. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS,
<br />FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITIONDEBRIS
<br />AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH
<br />MPCA DISPOSAL REQUIREMENTS.
<br />2. HAZARDOUS MATERIAL: OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES
<br />MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT
<br />SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS
<br />WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS.
<br />3. CONCRETE WASHOUT IS DONE TRUCK BY TRUCK WITH A MOBILE WASHOUT
<br />SYSTEM PROVIDED AND COMPLETED BY THE CONCRETE CONTRACTOR. RUNOFF
<br />MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF.
<br />4. NO ENGINE DEGREASING IS ALLOWED ON SITE
<br />FILTER ROCK
<br />CURB & GUTTER
<br />CURB SEDIMENT FILTER
<br />BOLTON FOND CURD SEDIMENT
<br />&MENK
<br />_FILTER
<br />Real P,ople. Real SoluLlons. DERO-501
<br />V! BOLTON
<br />,,)& MENK
<br />Real F.ple. Real SOluLlons.
<br />THE CONTRACTOR MUST ENSURE COMPLETE COVER OF THE SITE. THE CONTRACTOR MUST
<br />SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER PERMANENT COVER IS
<br />COMPLETE, OR ANOTHER OWNER/OPERATOR (PERMITTEE) HAS ASSUMED CONTROL OF ALL
<br />AREAS OF THE SITE THAT HAVE NOT UNDERGONE PERMANENT COVER. PERMANENT COVER
<br />CAN BE ACHIEVED IN THE FOLLOWING WAY:
<br />ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND ALL SOILS MUST BE
<br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT
<br />OVER THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENTMEANS NECESSARY TO
<br />PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS AND;
<br />A. ALL DRAINAGE DITCHES, CONSTRUCTED TO DRAIN WATER FROM
<br />THE SITE AFTER CONSTRUCTION IS COMPLETE, MUST BE STABILIZED TO
<br />PRECLUDE EROSION;
<br />B. ALL TEMPORARY SYNTHETIC, AND STRUCTURAL EROSION PREVENTION
<br />AND SEDIMENT CONTROL BMPS (SUCHAS SILT FENCE) MUST BE REMOVED AS
<br />PART OF THE SITE PERMANENT COVER; AND
<br />C. THE CONTRACTORS MUST CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND
<br />FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS
<br />PERMANENT WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE
<br />STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN,
<br />CONVEYANCES OR DRAINAGE WAYS DISCHARGING OFF-SITE OR TO SURFACE
<br />WATERS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO
<br />RETURN THE BASIN TO DESIGN CAPACITY.
<br />EROSION CONTROL SCHEDULE:
<br />1. PRIOR TO ANY CONSTRUCTION OR DEMOLITION, SILT FENCE AND FILTERS SHALL
<br />BE INSTALLED AS SHOWN TO INTERCEPT RUNOFF.
<br />2. ALL EROSION CONTROL INSTALLATIONS SHALL REMAIN IN PLACE AND BE MAINTAINED
<br />IN GOOD CONDITION BY THE CONTRACTOR UNTIL THE SITE HAS BEEN RE -VEGETATED.
<br />CONTRACTOR MAY REMOVE NECESSARY SILT FENCING/FILTERS TO CONSTRUCT ROADWAYS,
<br />WHILE MAINTAINING ADEQUATE EROSION CONTROL IN ADJACENT AREA.
<br />3. SUFFICIENT TOPSOIL SHALL BE STOCKPILED TO ALLOW FOR THE REPLACEMENT OF 4" OF
<br />TOPSOIL FOR DISTURBED AREAS TO BE RE -VEGETATED.
<br />4. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY INSTALLATION AND PAVEMENT
<br />CONSTRUCTION SO THAT THE GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON
<br />AFTER DISTURBANCE. AREAS THAT WILL NOT BE SUBJECT TO CONSTRUCTION TRAFFIC
<br />SHALL BE SEEDED (MnDOT MIX 22-112 ® 100#/AC AND MULCHED OR SODDED WITHIN
<br />SEVEN (7) DAYS OF BEING DISTURBED.
<br />5. CONTRACTOR SHALL INSTALL EROSION CONTROL DEVICES AS INDICATED ON THIS EROSION
<br />CONTROL PLAN AND ANY ADDITIONAL REQUIRED BASED ON MEANS, METHODS AND
<br />SEQUENCES OF CONSTRUCTION.
<br />;71
<br />�'
<br />TO
<br />su
<br />O!
<br />i
<br />BOLTON FON° pxpvurzn NLET PROTECTION
<br />&MENK AERO -104 ROAD DRAIN
<br />Real People. Real SOIUU003.
<br />SEDIMENT CONTROL PRACTICES:
<br />CITY OF ORONO RESOLUTI
<br />PERMANENT COVER:
<br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING
<br />SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS.
<br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT
<br />PERMITERS BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE
<br />PRACTICES SHALL REMAIN IN PLACE UNTIL PERMANENT COVER HAS BEEN
<br />ESTABLISHED.
<br />3. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE
<br />ADJUSTED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR
<br />GRUBBING, OR PASSAGE OF VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE
<br />COMPLETED ASQUICKLY AS POSSIBLE AND THE SEDIMENT CONTROL PRACTICES MUST
<br />BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS COMPLETED. HOWEVER, SEDIMENT
<br />CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT PRECIPITATION EVENT
<br />EVEN IF THE ACTIVITY IS NOT COMPLETE.
<br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING
<br />CONSTRUCTION UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET
<br />HAVE BEEN STABILIZED,
<br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCES OR OTHER EFFECTIVE
<br />SEDIMENT CONTROLS, AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING
<br />STORM WATER CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS
<br />AND DITCHES.
<br />6. SITE CONSTRUCTION ENTRANCES WILL BE AS SHOWN ON THE PLAN. ROCK
<br />CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT EACH ENTRANCE.
<br />POLLUTION PREVENTION
<br />MANAGEMENT MEASURES:
<br />THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION
<br />MANAGEMENT MEASURES ON THE SITE:
<br />1. SOLID WASTE: COLLECTED SEDIMENT, ASPHALT AND CONCRETE MILLINGS,
<br />FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION AND DEMOLITIONDEBRIS
<br />AND OTHER WASTES MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH
<br />MPCA DISPOSAL REQUIREMENTS.
<br />2. HAZARDOUS MATERIAL: OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES
<br />MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT
<br />SPILLS, LEAKS OR OTHER DISCHARGE. STORAGE AND DISPOSAL OF HAZARDOUS
<br />WASTE MUST BE IN COMPLIANCE WITH MPCA REGULATIONS.
<br />3. CONCRETE WASHOUT IS DONE TRUCK BY TRUCK WITH A MOBILE WASHOUT
<br />SYSTEM PROVIDED AND COMPLETED BY THE CONCRETE CONTRACTOR. RUNOFF
<br />MUST BE CONTAINED AND WASTE PROPERLY DISPOSED OF.
<br />4. NO ENGINE DEGREASING IS ALLOWED ON SITE
<br />FILTER ROCK
<br />CURB & GUTTER
<br />CURB SEDIMENT FILTER
<br />BOLTON FOND CURD SEDIMENT
<br />&MENK
<br />_FILTER
<br />Real P,ople. Real SoluLlons. DERO-501
<br />V! BOLTON
<br />,,)& MENK
<br />Real F.ple. Real SOluLlons.
<br />THE CONTRACTOR MUST ENSURE COMPLETE COVER OF THE SITE. THE CONTRACTOR MUST
<br />SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER PERMANENT COVER IS
<br />COMPLETE, OR ANOTHER OWNER/OPERATOR (PERMITTEE) HAS ASSUMED CONTROL OF ALL
<br />AREAS OF THE SITE THAT HAVE NOT UNDERGONE PERMANENT COVER. PERMANENT COVER
<br />CAN BE ACHIEVED IN THE FOLLOWING WAY:
<br />ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND ALL SOILS MUST BE
<br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT
<br />OVER THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENTMEANS NECESSARY TO
<br />PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS AND;
<br />A. ALL DRAINAGE DITCHES, CONSTRUCTED TO DRAIN WATER FROM
<br />THE SITE AFTER CONSTRUCTION IS COMPLETE, MUST BE STABILIZED TO
<br />PRECLUDE EROSION;
<br />B. ALL TEMPORARY SYNTHETIC, AND STRUCTURAL EROSION PREVENTION
<br />AND SEDIMENT CONTROL BMPS (SUCHAS SILT FENCE) MUST BE REMOVED AS
<br />PART OF THE SITE PERMANENT COVER; AND
<br />C. THE CONTRACTORS MUST CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND
<br />FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS
<br />PERMANENT WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE
<br />STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN,
<br />CONVEYANCES OR DRAINAGE WAYS DISCHARGING OFF-SITE OR TO SURFACE
<br />WATERS. THE CLEAN OUT OF PERMANENT BASINS MUST BE SUFFICIENT TO
<br />RETURN THE BASIN TO DESIGN CAPACITY.
<br />EROSION CONTROL SCHEDULE:
<br />1. PRIOR TO ANY CONSTRUCTION OR DEMOLITION, SILT FENCE AND FILTERS SHALL
<br />BE INSTALLED AS SHOWN TO INTERCEPT RUNOFF.
<br />2. ALL EROSION CONTROL INSTALLATIONS SHALL REMAIN IN PLACE AND BE MAINTAINED
<br />IN GOOD CONDITION BY THE CONTRACTOR UNTIL THE SITE HAS BEEN RE -VEGETATED.
<br />CONTRACTOR MAY REMOVE NECESSARY SILT FENCING/FILTERS TO CONSTRUCT ROADWAYS,
<br />WHILE MAINTAINING ADEQUATE EROSION CONTROL IN ADJACENT AREA.
<br />3. SUFFICIENT TOPSOIL SHALL BE STOCKPILED TO ALLOW FOR THE REPLACEMENT OF 4" OF
<br />TOPSOIL FOR DISTURBED AREAS TO BE RE -VEGETATED.
<br />4. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY INSTALLATION AND PAVEMENT
<br />CONSTRUCTION SO THAT THE GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON
<br />AFTER DISTURBANCE. AREAS THAT WILL NOT BE SUBJECT TO CONSTRUCTION TRAFFIC
<br />SHALL BE SEEDED (MnDOT MIX 22-112 ® 100#/AC AND MULCHED OR SODDED WITHIN
<br />SEVEN (7) DAYS OF BEING DISTURBED.
<br />5. CONTRACTOR SHALL INSTALL EROSION CONTROL DEVICES AS INDICATED ON THIS EROSION
<br />CONTROL PLAN AND ANY ADDITIONAL REQUIRED BASED ON MEANS, METHODS AND
<br />SEQUENCES OF CONSTRUCTION.
<br />BOLTONP'hFONO 7-HA'N
<br />&MENK AERO -106 CNLET PROTECTION
<br />ULVERT STANDPIPE
<br />roDle. RealSolutionx
<br />BOLTON
<br />& MENK
<br />Opk. Real SOlutlOnx
<br />N NO. 7206
<br />ALLIANT
<br />733 Marquette Avenue
<br />Suite 700
<br />Minneapolis, MN 55402
<br />612.758.3080
<br />www.alliant-ine.com
<br />David
<br />��]
<br />■ ►eekky
<br />Hames
<br />N
<br />Z
<br />CW
<br />C
<br />U
<br />O
<br />0
<br />Z
<br />O
<br />I-
<br />U
<br />MM
<br />cc
<br />H
<br />N
<br />Z
<br />O
<br />U
<br />I hereby certify that this plan,
<br />specification, o report wa
<br />prepared by m Or
<br />undermy
<br />direct E.IPI sionand that I
<br />a duly Licensed
<br />PROFESSIONAL ENGINEER under
<br />the laws of the Slate of
<br />MINNESOTA
<br />MARK RAUSCH, PE
<br />6-3-2021 43480
<br />Date License No.
<br />QUALITY ASSURANCE/CONTROL
<br />BY DATE
<br />DATE ISSUE
<br />1-20-2021 CITY SUBMITTAL - PRELIM PLAT
<br />4-21-2021 CITY SUBMITTAL
<br />6-3-2021 CONSTRUCTION DOCUMENTS
<br />PROJECT TEAM DATA
<br />DESIGNED: MPR
<br />DRAWN: TAS
<br />PROJECT NO: 220-0101
<br />0
<br />SHEET 9 OF 23
<br />;71
<br />�'
<br />TO
<br />su
<br />ROCK CONSTRUCTION ENTRANCE
<br />I ti
<br />FOND
<br />owroxATxo
<br />ROCK
<br />® BOLTON
<br />ERO-502
<br />CONSTRUCTION
<br />ENTRANCE
<br />& MENK
<br />Real People. Real5Olulipnx
<br />�--�� T LEVEL )MIN)
<br />4"OVERLAP
<br />/ " �
<br />i
<br />ANCHOR SLOTALTERNATIV
<br />I'S ON
<br />ON STAPLES
<br />/
<br />NOTE:
<br />ANCHOR, OVERLAP & STAPLE
<br />PERMANUFACTURER'SSPECIR TIONS
<br />FOLD UNDER 6"
<br />EROSION CONTROL BLANKET INSTALLATION
<br />NOT.-
<br />s�F°yA'O
<br />-
<br />Roxoxnmx
<br />oERO-200
<br />EROSION CONTROL
<br />BLANKET INSTALL
<br />BEFUMLOG
<br />BOLTON
<br />&MENK
<br />Real People Rall Soldionx
<br />BOLTONP'hFONO 7-HA'N
<br />&MENK AERO -106 CNLET PROTECTION
<br />ULVERT STANDPIPE
<br />roDle. RealSolutionx
<br />BOLTON
<br />& MENK
<br />Opk. Real SOlutlOnx
<br />N NO. 7206
<br />ALLIANT
<br />733 Marquette Avenue
<br />Suite 700
<br />Minneapolis, MN 55402
<br />612.758.3080
<br />www.alliant-ine.com
<br />David
<br />��]
<br />■ ►eekky
<br />Hames
<br />N
<br />Z
<br />CW
<br />C
<br />U
<br />O
<br />0
<br />Z
<br />O
<br />I-
<br />U
<br />MM
<br />cc
<br />H
<br />N
<br />Z
<br />O
<br />U
<br />I hereby certify that this plan,
<br />specification, o report wa
<br />prepared by m Or
<br />undermy
<br />direct E.IPI sionand that I
<br />a duly Licensed
<br />PROFESSIONAL ENGINEER under
<br />the laws of the Slate of
<br />MINNESOTA
<br />MARK RAUSCH, PE
<br />6-3-2021 43480
<br />Date License No.
<br />QUALITY ASSURANCE/CONTROL
<br />BY DATE
<br />DATE ISSUE
<br />1-20-2021 CITY SUBMITTAL - PRELIM PLAT
<br />4-21-2021 CITY SUBMITTAL
<br />6-3-2021 CONSTRUCTION DOCUMENTS
<br />PROJECT TEAM DATA
<br />DESIGNED: MPR
<br />DRAWN: TAS
<br />PROJECT NO: 220-0101
<br />0
<br />SHEET 9 OF 23