My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
07-19-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2021 8:25:52 AM
Creation date
7/20/2021 7:45:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#LA21-000047 <br /> 19 July 2021 <br /> Page 2 of 6 • <br /> They have provided supporting documentation regarding Practical Difficulties attached as Exhibit B, <br /> and should be asked for additional testimony regarding the application if necessary. <br /> Planning Staff Practical Difficulty Analysis: This is one of two 'boat houses' in the camp. The City <br /> Council did not support the modification of the other one during the master planning process. Staff <br /> cannot support the expansion of this boat house structure in the 0-75. Staff can support findings that <br /> support the placement of dock sections providing ease of access to the dock in the water given, <br /> including site topography, and existing conditions as practical difficulties. The overall proposed Master <br /> Plan is using the land in a reasonable manner and taking into considerations the unique characteristics <br /> of the property. <br /> �.ses aae_ <br /> W:s:.a:ir:a:'AVe..Va*.:,::4,.::1:„1:1:1.,11:8.)M.:.a..1.s,.::.ir'*.: <br /> Isaii% ,:,E,,:,1„Hi:ti.4;,,Ei,:!:::::•:',:. ,..:i„.::„.. <br /> JR.:.: ►' fir'� . --'' 1s., <br /> ,:.... ..„may} '}„: IIIM��I I� <br /> ,: <br /> :_.::..: <br /> :, <br /> .:1{Il ilii }r, ..• <br /> ::::::::::::::t <br /> . .. _'i <br /> .._ ._..A _mss__LI <br /> - <br /> '. � � <br /> . <br /> • <br /> Proposed building shown with Existing Building as RED overlay <br /> LOT ANALYSIS WORKSHEET <br /> Section 78-330&8-1279—Boat Building Setbacks: <br /> LR-1B Required Existing Proposed <br /> Rear/Street 30' +300' No Change <br /> Side Yard 10' +300' No Change <br /> Lakeshore 75' ±17' ±17' <br /> Average Lakeshore The shoreline curves into the property;the average lakeshore <br /> setback is met. <br /> Section 78-330—Lot Area/Width: <br /> DISTRICT LR-1B Lot Area Lot Width <br /> Required 43,560 s.f. (1 acres) 140' <br /> Actual 801,054 s.f. (18.3 acres) ± 1500'@ 75'/1500' @ OHWL <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.