Laserfiche WebLink
• Date Application Received: 06/22/2021 <br /> Date Application Considered as Complete:07/07/2021 �O�O <br /> 60-Day Review Period Expires: 09/05/2021 <br /> To: Chair Kirchner and Planning Commission Members <br /> Adam Edwards, City Administrator `� • <br /> IkES H <br /> From: Melanie Curtis, Planner h'1GG <br /> Date: 19 July 2021 <br /> Subject: #LA21-000047, MATCOM: Mark Matasovsky o/b/o Temple Israel of Minneapolis, <br /> 645 Tonkawa Road <br /> Variance- Public Hearing <br /> Application Summary: The applicant is requesting variances to reconstruct the existing "boat <br /> building/shed" with a small footprint and height expansion and change the lake boardwalk <br /> configuration within the 75-foot setback. <br /> Staff Recommendation: Planning Staff recommends partial approval as noted on Page 5. <br /> Background <br /> Camp TEKO has been operating on the property at 645 Tonkawa since 1965. In 2019,they submitted a <br /> IPMaster Plan showing a number of desired future improvements.These include a new program center, <br /> program cabins, waterfront improvements, changing rooms, parking,welcome center, maintenance <br /> building,entrance monuments/gates, cabin renovations, leader lodge, pavilion, program platforms, <br /> new shelters, restrooms, and a new trail and path network. Resolution No. 7003 is attached as Exhibit <br /> G reflecting the approvals granted for implementation of the Master Plan.Temple Israel,the owner, is <br /> working with a new architectural firm.They are planning on implementing the Master Plan in phases. <br /> The boat building which is the subject of this current application was not part of the original Master <br /> Plan approval, nor was it shown on the plan(s). <br /> ..� 2472 : t ,,p: �,y� <br /> n,o„V, 2w ,�„ ,,,, 1 o. l� The applicant has begun to move forward with <br /> 2"' Phase One of the Master Plan (Exhibit D page 2). A <br /> • s.ro'° 2.» no <br /> 21,1 2u4 s i <br /> 2t portion of Phase One (lake access boardwalk <br /> N7) t 344, changes and reconstruction of the "boat building" <br /> '$'♦~ S76.2 <br /> 27M165440• 2445 ' , 3 ISO MIS (shed)) requires hardcover and lake setback <br /> tilt -JQt b hifn J.OB <br /> 3144 <br /> 11 <br /> 0.31 *es ' 1141 <br /> „ �,,, WA variances. The project will result in a hardcover <br /> 240.7 0.6:N« 2412.0! 3:419'od , increase of 226.5 square feet.The re-built"boat <br /> _ 2 �— - — — _ building”/storage shed within the 75' lake yard is <br /> nos used to house lifejackets, paddles, and other lake <br /> use accessories. Please refer to the owner's <br /> Boat Building /"shed" narrative included as Exhibit A for more detail. <br /> to be replaced. <br /> Practical Difficulties Analysis <br /> Applicant Submittal Information:The applicant has <br /> LAKE MiNNETO3 KA <br /> identified topography, proximity to the lake, and <br /> • existing conditions as practical difficulties supporting the requested variances in addition to their <br /> specific use accessibility needs and safety concerns. <br />