My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-2020 Council Work Session Packet
Orono
>
City Council
>
1950-2024
>
1999-2016 work sessions
>
2020
>
08-13-2020 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 10:16:37 AM
Creation date
4/15/2021 10:16:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Letter to Adam Edwards <br />Page 2 <br /> <br /> <br /> <br />Option B: <br />Despite the drop in existing grade across the property from east to west, this option locates the <br />proposed building much further west to allow for separation from the southern neighboring <br />residential property and leaves space for potential future development for the city. To <br />accomplish this siting, the site would require significant mass grading to create a lower <br />buildable pad. To mitigate the height of the built up pad, the building location must move <br />further north to allow grades to return to existing at the southern property line. This results in <br />a much tighter north drive lane and tighter, but workable turning radii for the public works <br />vehicles. In addition, this option sets up the site for better expansion of the public works <br />campus to the west and into the adjacent city owned parcel. <br /> <br /> <br />Estimated Project Costs: <br /> <br />Based upon the preferable qualities and the relatively minor difference in grading costs, we have <br />estimated the potential total projects costs of the development of a Public Works facility at 365 Old <br />Crystal Bay Road as follows: <br /> <br />Construction Cost (34,650sf X $200/sf) $ 6,930,000 <br />Site Development Cost $ 750,000 <br />Utility Connection Cost $ 200,000 <br />Total Construction Cost $ 7,880,000 <br />Misc Project Costs (Fees, Testing, FF&E, Contingencies) $ 1,970,000 <br />Recommended Total Project Budget $ 9,850,000 <br /> <br />Thank you for this opportunity to perform this Feasibility Study and please call me if you have <br />questions. <br /> <br />Sincerely, <br /> <br />Wold Architects and Engineers <br /> <br /> <br /> <br /> <br />Joel L. Dunning | AIA, LEED AP <br />Partner <br /> <br /> <br />cc: David Martini, Bolton & Menk <br />Jonathan Loose, Wold <br /> Melissa Stein, Wold <br /> <br />LW/CI_Orono/202127/crsp/aug20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.