My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-2021 Council Packet
Orono
>
City Council
>
2021
>
01-11-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:58:12 AM
Creation date
4/15/2021 9:55:22 AM
Metadata
Text box
ID:
1
Creator:
Created:
4/15/2021 9:58 AM
Modified:
4/15/2021 9:58 AM
Text:
https://mn.gov/mmb/assets/Capital%20Grants%20Manual%20May%202014%20REVISED_updated%20links_tcm1059-291111.pdf
ID:
2
Creator:
Created:
4/15/2021 9:58 AM
Modified:
4/15/2021 9:58 AM
Text:
https://mn.gov/mmb/assets/Capital%20Grants%20Manual%20May%202014%20REVISED_updated%20links_tcm1059-291111.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br /> <br />11. Please review the STATE OF MINNESOTA CAPITAL GRANTS MANUAL <br />(https://mn.gov/mmb/assets/Capital%20Grants%20Manual%20May%202014%20REVISED_up <br />dated%20links_tcm1059-291111.pdf) and attach a completed copy of the CAPITAL PROJECT <br />CHECKLIST (pages 7-10 of manual) with this application: See Attached. <br />Sources and Uses Budget ($300,000 Grant) <br />1 Includes City Park funds and donations to the City for the project. <br />* Other = A 2019 MnDNR Grant. This grant requires a 50% non-state match from the City. <br /> <br /> <br />Project Timeline <br /> <br />Activity Finish <br /> <br />All permits in place October 2020 <br /> <br />Project out for public bid March 2020 <br /> <br />Bid accepted 1 April 2020 <br /> <br />Project started 2 November 2020 <br /> <br />Project complete November 2021 <br /> <br />Project inspected and operational November 2021 <br /> <br />Notes: 1 The original project began in 2020. The additional items funded by the Bond funds will be <br />executed as change order in November 2020-February 2021. <br />2 The original project started in 2020 the additional work funded by the Bond will occur in 2021 <br /> <br /> <br /> <br /> <br />Project Activities DEED City1 Bank <br /> <br />Other* Total <br />ADA Trail Construction $ 20,000 $ 101,510 $103,000 $ 224,510 <br />Sitting Stone Areas $ 5,955 $ 3,945 $ 6,000 $ 15,900 <br />Vault Toilet #1 $ 19,500 $ 26,500 $ 47,000 $ 93,000 <br />Vault Toilet #2 $ 120,800 $ 120,800 <br />Shelter and Picnic Tables $ 71,213 $ 13,151 $ 24,826 $ 109,190 <br />Interpretive Signage $ 20,000 $ 4,820 $ 24,820 <br /> <br />Archeology $ 3,412 $ 22,860 $ 26,272 <br />Design and Engineering $ 10,000 $ 34,900 $ 44,900 <br />Construction Management $ 29,120 $ 10,000 $ 4,000 $ 43,120 <br /> <br />Total Costs $ 300,000 $ 217,686 $184,826 $ 702,512
The URL can be used to link to this page
Your browser does not support the video tag.