4
<br />
<br />3. Provide engineering and/or architectural total project cost estimate documents:
<br />
<br />No.Item Units Qty Unit Price Total Price
<br />Base Bid:
<br />1 MOBILIZATION LS 1 70,500$ 70,500$
<br />2 FILTER LOG LS 2,700 6$ 16,200$
<br />3 COIR BLOCK SHORELINE RESTORATION LS 100 95$ 9,500$
<br />4 TREE PROTECTION LF 1,600 5$ 8,000$
<br />5 COMMON EXCAVATION (P)LF 800 40$ 32,000$
<br />6 AGGREGATE BASE (CLASS 5) TON 154 115$ 17,710$
<br />7 CRUSHED LIMESTONE TRAIL EA 240 125$ 30,000$
<br />8 REMOVABLE BOLLARD LS 4 1,400$ 5,600$
<br />9 GRANITE BOULDER EA 4 875$ 3,500$
<br />10 LIMESTONE SEAT BLOCK EA 6 1,325$ 7,950$
<br />11 SEED, FERTILIZER & MULCH (SEED MIX 25-131)EA 1 11,500$ 11,500$
<br />Base bid Subtotal 212,460$
<br />Bid Alternates:
<br />A1 VAULT TOILET (NEAR CITY DOCKS)EA 1 93,000$ 93,000$
<br />A2 4" CONCRETE PAVEMENT W/ 4" AGGREGATE BASE SF 890 27$ 24,030$
<br />A3 SHELTER STRUCTURE EA 1 49,000$ 49,000$
<br />A4 PICNIC TABLE- STANDARD EA 2 5,000$ 10,000$
<br />A5 PICNIC TABLE - WHEELCHAIR ACCESSIBLE EA 2 5,000$ 10,000$
<br />Alternate Total 186,030$
<br />Base bid + Alternates 398,490$
<br />City Procured and Installed
<br />15 Interpretive Sights EA 7 513$ 3,591$
<br />16 Visitor Center interior Painting LS 1 200$ 200$
<br />17 INFORMATIONAL SIGN EA 2 513$ 1,026$
<br />TOTAL City Procured and Installed 4,817$
<br />Change Orders
<br />C1 Additional Limestone Seat Block EA 3 1,326$ 3,977$
<br />C2 Additional Mobilization +A2,3,4 EA 1 16,160$ 16,160$
<br />C3 Additional Vault Toilet EA 1 120,800$ 120,800$
<br />C4 Additional Trail LS 1 20,000$ 20,000$
<br />C5 Additional Interpretive Signage LS 1 20,000$ 20,000$
<br />C6 Additional Limestone Seat Block EA 3 1,326$ 3,977$
<br />Change order Total 184,913$
<br />Construction Subtotal 588,220$
<br />Design, Management and Admin
<br />Design LS 1 34,900$ 34,900$
<br />Design Additions for C4-6 LS 1 10,000$ 10,000$
<br />Archeology LS 1 22,860$ 22,860$
<br />Additional Archeology for C4-6 LS 1 3,412$ 3,412$
<br />Construction Oversight LS 1 31,560$ 31,560$
<br />Additional construction oversight for C3-6 LS 1 11,560$ 11,560$
<br />TOTAL Design, Management and Admin 114,292$
<br />TOTAL 702,512$
<br />As of 4 Dec 20
<br />Big Island Park Project Cost Estimate
|