Laserfiche WebLink
4 <br /> <br />3. Provide engineering and/or architectural total project cost estimate documents: <br /> <br />No.Item Units Qty Unit Price Total Price <br />Base Bid: <br />1 MOBILIZATION LS 1 70,500$ 70,500$ <br />2 FILTER LOG LS 2,700 6$ 16,200$ <br />3 COIR BLOCK SHORELINE RESTORATION LS 100 95$ 9,500$ <br />4 TREE PROTECTION LF 1,600 5$ 8,000$ <br />5 COMMON EXCAVATION (P)LF 800 40$ 32,000$ <br />6 AGGREGATE BASE (CLASS 5) TON 154 115$ 17,710$ <br />7 CRUSHED LIMESTONE TRAIL EA 240 125$ 30,000$ <br />8 REMOVABLE BOLLARD LS 4 1,400$ 5,600$ <br />9 GRANITE BOULDER EA 4 875$ 3,500$ <br />10 LIMESTONE SEAT BLOCK EA 6 1,325$ 7,950$ <br />11 SEED, FERTILIZER & MULCH (SEED MIX 25-131)EA 1 11,500$ 11,500$ <br />Base bid Subtotal 212,460$ <br />Bid Alternates: <br />A1 VAULT TOILET (NEAR CITY DOCKS)EA 1 93,000$ 93,000$ <br />A2 4" CONCRETE PAVEMENT W/ 4" AGGREGATE BASE SF 890 27$ 24,030$ <br />A3 SHELTER STRUCTURE EA 1 49,000$ 49,000$ <br />A4 PICNIC TABLE- STANDARD EA 2 5,000$ 10,000$ <br />A5 PICNIC TABLE - WHEELCHAIR ACCESSIBLE EA 2 5,000$ 10,000$ <br />Alternate Total 186,030$ <br />Base bid + Alternates 398,490$ <br />City Procured and Installed <br />15 Interpretive Sights EA 7 513$ 3,591$ <br />16 Visitor Center interior Painting LS 1 200$ 200$ <br />17 INFORMATIONAL SIGN EA 2 513$ 1,026$ <br />TOTAL City Procured and Installed 4,817$ <br />Change Orders <br />C1 Additional Limestone Seat Block EA 3 1,326$ 3,977$ <br />C2 Additional Mobilization +A2,3,4 EA 1 16,160$ 16,160$ <br />C3 Additional Vault Toilet EA 1 120,800$ 120,800$ <br />C4 Additional Trail LS 1 20,000$ 20,000$ <br />C5 Additional Interpretive Signage LS 1 20,000$ 20,000$ <br />C6 Additional Limestone Seat Block EA 3 1,326$ 3,977$ <br />Change order Total 184,913$ <br />Construction Subtotal 588,220$ <br />Design, Management and Admin <br />Design LS 1 34,900$ 34,900$ <br />Design Additions for C4-6 LS 1 10,000$ 10,000$ <br />Archeology LS 1 22,860$ 22,860$ <br />Additional Archeology for C4-6 LS 1 3,412$ 3,412$ <br />Construction Oversight LS 1 31,560$ 31,560$ <br />Additional construction oversight for C3-6 LS 1 11,560$ 11,560$ <br />TOTAL Design, Management and Admin 114,292$ <br />TOTAL 702,512$ <br />As of 4 Dec 20 <br />Big Island Park Project Cost Estimate