Laserfiche WebLink
Preliminary Plat Application <br />Shoreline Estates <br />Page 3 <br /> <br />H:\ORNO\C13120357\z_Shoreline Estates\ShorelineEstates_PrePlatReview_2021-1-19.docx <br /> <br />maintained. <br />13. A sump manhole must be provided upstream of all inlets to the rain garden in the street per <br />NPDES requirements. <br />14. Manholes must be included on storm sewer to rain garden as necessary to route runoff directly <br />into basin. <br />15. The street must transition from urban to rural street section at Station 4+50 to better manage <br />runoff not routed to the rain garden. Ditches do not need to be included. Due to the existing <br />wetland on the west side and an existing culvert on the east, runoff will naturally drain away <br />from the road. A Rural Typical Section should be included on the Road Plan accordingly. <br /> <br /> <br />If you have any questions or comments, please contact me to discuss. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer <br /> <br />CC: Adam Edwards, Director of Public Works / City Engineer