Laserfiche WebLink
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: RJO Approved By: RJO <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this item is to gain council authorization to solicit proposals for the design <br />of a new public works facility. <br /> <br />2. Background. In 2020 the City Council expressed an interest in procuring land and constructing a <br />new public works facility. In October for 2020 Wold Architects and Engineering with collaboration from <br />Bolton and Menk, Inc (BMI) conducted a feasibility study based on using 365 Old Crystal Bay (OCB) <br />Road and constructing a 34,600 ft2 facility. The feasibility study estimated a total cost of $9.8M plus land <br />acquisition costs. The City acquired the parcel at 365 OCB January of this year. At the March 8th, 2021 <br />Council meeting BMI was selected to complete utility design for the sewer and water extensions for the <br />site and the comprehensive plan amendment to extend the MUSA to the site. <br /> <br />3. Project Scope. The overall scope of the work will be to construct a new public works facility at 365 <br />OCB. Building site is estimated at 38,900 sf with an additional 42,600 sf of site improvements. <br /> <br />4. A/E Design and construction Services Scope of work. The scope of services shall include and be <br />broken out in the following phases - conceptual planning and cost estimating, preliminary site/building <br />layouts, final design, preparation of construction documents, (plans, specifications, bidding and contract <br />documents, etc.), bidding administration, and construction administration. <br /> <br />5. Estimated Project Costs. The overall cost of the project is estimated below. The low end estimate <br />is based on an assumed $100/ sf and the high end estimate on a $200 / sf. <br />Activity Estimated Cost Comment <br />Parcel Purchase $ 340,000 Complete <br />Utility Design $ 28,736 NTE previously approved <br />Utility Connection Cost $ 250,000 Estimate from feasibility <br />Site Development Cost $ 750,000 Estimate from feasibility <br />Building/ Facility Construction $ 3,890,000 to $ 7,780,000 <br />Misc Project Costs (Fees, Testing, <br />FF&E, Contingencies) <br /> $ 1,137,500 to $ 2,087,500 Assumes 25% of construction <br />cost <br />Total Project Cost $ 6,418,736 to $ 11,281,236 <br /> <br />6. Funding. Funding for the project would come from municipal bonds. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to authorize staff to solicit proposals from architecture and engineering firms for the design and <br />construction services related construction of a new public works facility. <br /> <br />Exhibits <br />A. RFP for Architectural and Engineering Services for a New Public Works Facility. <br /> <br /> <br /> <br />Item No.: 16 Date: March 29, 2021 <br />Item Description: Public Works Facility Request for Architecture and Engineering <br />(A/E) Proposals <br />Presenter: Adam T. Edwards, P.E <br />City Engineer/ Dir of Public Works <br />Agenda <br />Section: <br />City Engineer / Public <br />Works <br />