My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-2021 Council Packet
Orono
>
City Council
>
2021
>
04-12-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 9:20:11 AM
Creation date
4/15/2021 9:09:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> Created: 2021-02-27 04:26:59 [EST] <br />(Supp. No. 19, Update 1) <br /> <br />Page 1 of 4 <br />ORDINANCE NO. ___, THIRD SERIES 1 <br /> 2 <br />CITY OF ORONO 3 <br />HENNEPIN COUNTY, MINNESOTA 4 <br /> 5 <br />AN ORDINANCE AMENDING THE CODE OF ORDINANCES 6 <br />PERTAINING TO THE BUILDING CODE, APPEALS, PLUMBING PLAN REVIEW 7 <br />AND STATE STATUTE REFERENCES 8 <br /> 9 <br /> 10 <br />THE CITY COUNCIL OF ORONO ORDAINS: 11 <br /> 12 <br />SECTION 1. Sec. 86-01 shall be amended by adding text to read as follows: 13 <br />Sec. 86-1. Permits and special requirements for moving buildings. 14 <br />(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings 15 <br />ascribed to them in this subsection, except where the context clearly indicates a different meaning: 16 <br />Street means all streets and highways in the city which are not state trunk highways, county state-aid 17 <br />highways, or county roads. 18 <br />(b) Moving permit required and application. 19 <br />(1) It is unlawful for any person to move a building on any street without a moving permit from the city. 20 <br />(2) The application for a moving permit shall state the approximate size and weight of the structure or 21 <br />building proposed to be moved, together with the places from and to which it is proposed to move the 22 <br />structure or building, and proposed route to be followed, proposed dates and times of m oving and 23 <br />parking, and the name and address of the proposed mover. Such application shall also state any 24 <br />municipal utility, street and public property repairs or alterations that will be required by reason of 25 <br />such movement. 26 <br />(c) Permit and fee. The moving permit shall state the date or dates of moving, hours, routing, movement and 27 <br />parking. Permits shall be issued only for moving buildings by building movers licensed by the state. Fees to be 28 <br />charged shall be separate for each of the following: 29 <br />(1) A moving permit fee to cover use of streets and route approval; and 30 <br />(2) A fee equal to the anticipated amount required to compensate the city for any municipal utility and 31 <br />public property (other than streets) repairs or alterations occasioned by such movement, whi ch shall 32 <br />be paid in advance. 33 <br />(d) Building permit and code compliance. Before any building is moved from one location to another within the 34 <br />city, or from a point of origin without the city to a destination within the city, regardless of the route of 35 <br />movement, it shall be inspected and a building permit shall have been issued for at least the work necessary 36 <br />to bring it into full compliance with the state building code, including site, utility, and foundation work. 37 <br />(e) Proof of tax payment. It is unlawful to move any building (including a manufactured home) if the point of 38 <br />origin or destination (or both) is within the city, and regardless of the route of movement, without having 39 <br />paid in full all real and personal property taxes and special assessments due on the building, and filing 40 <br />written proof of such payment with the city. 41 <br /> 42 <br />Council <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.