My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7188
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 7100 - 7199 (May 26, 2020 - June 28, 2021)
>
Resolution 7188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 10:19:08 AM
Creation date
4/13/2021 10:18:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�OAp CITY OF ORONO <br /> RESOLUTION OF THE CITYY COUNCIL <br /> � NO. 71 88 <br /> l�&ESHO�� <br /> 2. Watershed District(MCWD) approval, including provision of easement necessary <br /> to support the pond and related infrastructure on the property. <br /> 3. Hennepin County approval, outlined in the comment letter dated March 17, 2021 <br /> and attached as Exhibit D. <br /> 4. Suitable documentation for two septic sites for each lot to be provided prior to Final <br /> Plat. <br /> 5. The following estimated fees are due at the time of final plat unless otherwise noted. <br /> These fees are based on the 2021 Fee schedule and the fee schedule in effect at the <br /> time of Final Plat approval will govern. <br /> a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br /> and Drainage Trunk Fee (SW&DT Fee) of$16,120.00 (Number of new lots (2) <br /> times per lot amount($8,060). <br /> c. Park dedication: $11,100.00 ($5,550 x 2 new lots). <br /> B. General conditions imposed on preliminary plats shall apply, and are as follow: <br /> 1. Appropriate traffic control signage within and pertinent to the site shall be installed <br /> by the Developer subject to the City Engineer's review and approval. <br /> 2. Erosion control shall adhere to "Best Management Practices for Protecting Water <br /> Quality in Urban Areas" and to the approved SWPPP. All erosion controls as <br /> required by the City and the MCWD shall be in place prior to commencing grading <br /> and excavation on the site. All such erosion control measures shall be maintained <br /> in working order until the site is vegetated and stabilized. <br /> 3. The construction limits shall be clearly marked with adequate fencing to prevent <br /> any construction damage or disturbance of any trees and vegetation outside of the <br /> construction limits area. Developer shall identify trees to be preserved on site, shall <br /> mark them on a site plan, and shall take extraordinary measures such as fencing, <br /> signage, etc.to ensure they are not disturbed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.