My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7188
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 7100 - 7199 (May 26, 2020 - June 28, 2021)
>
Resolution 7188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 10:19:08 AM
Creation date
4/13/2021 10:18:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-siLOAtp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> . 4* NO. 71 88 <br /> �' G <br /> `�'ESHG4`" <br /> 4. The Property contains 24.68 acres in area. <br /> 5. The parcel will be subdivided into 3 buildable lots and 1 outlot for a private road. All lots <br /> conform to the size and width requirements of the LR-1A zoning district upon being <br /> combined. <br /> 6. The Developer has prepared grading plans to manage stormwater on site conforming to <br /> applicable rules and ordinances. <br /> 7. Access to the property is via County Road 6, a Hennepin County road. <br /> 8. While the parcel is located within the Metropolitan Urban Service Area (MUSA),the lots <br /> will be served by on-site septic systems because the City Council finds that sanitary sewer <br /> is not reasonably accessible,per Section 82-223. <br /> 9. Water will be provided via on-site wells. <br /> 10. The Parks, Trails and Open Space element of the Orono Community Management Plan <br /> (CMP)has no current plans for parks that specifically require dedication of park land from <br /> this property. <br /> 11. The City Council finds that a conservation design plan is not necessary due to the scope of <br /> the development and the intention to minimize grading, and waives the requirement as <br /> authorized in Section 82-300. <br /> CONCLUSIONS, ORDER AND CONDITIONS: <br /> Further, based upon one or more of the above findings, the Orono City Council hereby grants <br /> preliminary plat approval to allow the subdivision of the property into 3 buildable lots,as depicted <br /> on the plans most recently updated February 25, 2021 prepared by Gronberg and Associates, <br /> attached as Exhibit B, subject to the following conditions: <br /> A. Project Specific Conditions <br /> 1. The applicable general engineering comments and or conditions provided by City <br /> Engineer in their comment letter dated March 1, 2021 (Exhibit C) shall be suitably <br /> addressed by applicant in the development plan submittal. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.