Laserfiche WebLink
(6) Staging and timing of the development. <br /> The comments of the planning commission and city council shall address the consistency of the concept plan with this <br /> section.The comments of the planning commission and city council shall be for guidance only and, if positive,shall not <br /> be considered binding upon the planning commission or city council regarding approval of the formal RPUD <br /> application when submitted. <br /> (b) Master development plan and rezoning.Approval of a rezoning to RPUD and approval of a master development plan <br /> shall be subject to the procedures outlined in this chapter for a zoning map amendment.The master development <br /> plan shall contain the following: <br /> (1) Building location, height, bulk and square footage; <br /> (2) Type and square footage of specific land uses; <br /> (3) Number of dwelling units; <br /> (4) Detailed street and utility locations and sizes; <br /> (5) Parking layout; <br /> (6) Drainage plan, including location and size of pipes and water storage areas; <br /> (7) Grading plan and drainage plan,including two-foot contours; <br /> (8) Generalized landscape plan; <br /> (9) Generalized plan for uniform signs and lighting; <br /> (10) Plan for timing and phasing of the development; <br /> (11) Covenants or other restrictions proposed for the regulation of the development; <br /> (12) Renderings or elevations of all sides of buildings to be constructed in the first phase of the development; <br /> (13) Trail plan; and <br /> (14) Lighting plan. <br /> Approval of the master development plan shall indicate approval of the listed items in subsections(b)(1)—(b)(14)of <br /> this section and shall occur in conjunction with rezoning of the property to RPUD.After rezoning the property to <br /> RPUD, nothing shall be constructed on the RPUD site except in conformance with the approved plans and this section. <br /> The procedure for notification of and public hearing on the master development plan shall be the same as required <br /> for a zoning map amendment by this chapter. <br /> (c) Development agreement/financial guarantee. Following the approval of the master development plan but prior to <br /> final plan approval,the applicant shall enter into an agreement with the city relating to the terms of the RPUD <br /> development,and shall also provide such financial guarantees as the city requires or deems necessary.Such <br /> agreement may take the form of: <br /> (1) A development contract; <br /> (2) A site improvement performance agreement; and/or <br /> (3) Another form of binding instrument as may be required by the city. <br /> (d) Final site and building plan.Approval of a final site and building plan for the entire RPUD or for specific parts of the <br /> RPUD shall be subject to the procedures outlined in this division.The final site and building plan shall contain <br /> information as required by the city, including the following: <br /> (1) Detailed utility,street,grading and drainage plans; <br /> (2) Detailed building elevations and floor plans; <br /> (3) Detailed landscaping,sign and lighting plans; and <br /> (4) Detailed trail plan. <br />