My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7177
Orono
>
Resolutions
>
Reso 0001-7499
>
Reso 7100 - 7199 (May 26, 2020 - June 28, 2021)
>
Resolution 7177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 2:57:13 PM
Creation date
3/12/2021 1:49:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4iL,0410..‘ CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 7 1 7 7 <br /> 'OsHO' <br /> 20. Site Grading. The property is very flat, with elevations generally between 1017' and <br /> 1021',slightly lower on the westside near the regional pond,slightly higher along the north <br /> edge. In order to prepare home sites,a significant amount of excavation and filling will be <br /> necessary,including soil replacement for stability as well as adding significant amounts of <br /> fill to ensure adequate site drainage and elevate homes above the high seasonal water table. <br /> 21. Stormwater Management. Stormwater management is proposed to be provided by <br /> filtration basins along the north side,and in the SW comer,which ultimately discharges to <br /> the regional pond intended for the Stonebay Development, including this lot. These <br /> facilities will be subject to standard drainage easements. In addition to the City of Orono, <br /> the Minnehaha Creek Watershed District have approval authority over the applicants' <br /> stormwater management plan. Final stormwater plans will be subject to the <br /> recommendations and approval of the City Engineer. <br /> 22. Stormwater and Drainage Improvements & Fees. The property will be subject to the <br /> Stormwater and Drainage Trunk Fee. The 2021 fee schedule requires a rate of$8,490.00 <br /> per acre(Multifamily Residential greater than 4 units per acre),for an estimated Trunk Fee <br /> of 3.69 acres x$8,490/acre=$31,328.10. <br /> 23. Utility Locations/Availability/Assessments/Connection Fees. Preliminary connection <br /> charges for the applicants' site are estimated at $161,690 for municipal water and <br /> $199,060 for municipal sanitary sewer. The Metropolitan Council will also require a <br /> Sewer Access Charge at the time each building permit is issued. That rate is currently <br /> $2,485 per residential unit. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.