Laserfiche WebLink
Exhibit A <br /> <br /> <br />Parks Planning <br />2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 <br />Dock or Swimming Platform for Sandy Beach <br />10,000$ <br />Summit Beach Improvements (Playground, pave <br />parking, signage, toilet improvements)$95,300 <br />French Creek Park (Tree Maintenance and Planting) <br />$20,000 <br />Hackberry Improvements (Scope to be determined)$300,000 <br />Playground Equipment (Antoine) <br />$65,000 Replacement Cycle <br />Crystal Bay Park Improvements (Scope to be <br />determined)300,000$ <br />Playground Equipment (Crystal Bay, Navarre, <br />Hackberry, Bederwood, Antoine)70,000$ <br />GC Wetland and Fairway #4 Improvements <br />$160,000 <br />GC Lawn Bowling $80,000 CMP GC Priority 5 <br />GC Tow Rope $102,000 CMP GC Priority 6 <br />GC Perimeter Trail $214,700 CMP GC Priority 7 <br />GC Miscellaneous improvements $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $10,000 <br />Lake access Refresh (gravel, signage, fencing and <br />gates)10,000$ 10,000$ Maintenance Cycle <br />Dock Replacement (15 year life) <br />$10,000 $10,000 Replacement Cycle <br />Trail Construction along CSAH 19 (Livingston to <br />Dakota) $120,000 CMP Trail Priority 2 <br />CR 6 Trail (OCB - Willow) Improvement <br />$36,402 <br />CSAH 112 PH 3 Trail (School to CSAH 6) <br />$929,333 <br />Connects to CMP <br />Trail priority 4 <br />Trail construction along North Arm drive to <br />Lakeview Legacy Park $80,000 CMP Trail priority 3 <br />Trail Construction along OCB and North Shore (Luce <br />Line to Dakota)$567,000 CMP trail priority 5 <br />Trail Construction along Hunter or Ferndale Roads <br />connection Luce line to northern boundary <br />$133,890 CMP Trail priority 6 <br />Trail Access to Lowry Woods <br />$100,000 CMP Trail Priority 7 <br />Tool Cat $66,684 <br />Tee Mower 38,000$ <br />Greens Mower 9,700$ <br />Top Dresser 16,800$ $53,500 <br />Rough Mower 65,500$ <br />Greens / Turf Roller 13,000$ <br />Mower (Big island)8,961$ <br />Totals $206,684 $1,050,235 $185,300 $383,500 $245,000 $190,000 $334,390 $533,661 $577,000 $90,000 <br />Lurton gravel trails $20,000 $20,000 <br />Parking Lot Repave 50,000$ <br />Prairie Maintenance Contract 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ 4,000$ <br />Totals $24,000 $4,000 $4,000 $24,000 $4,000 $4,000 $4,000 $4,000 $54,000 $4,000 <br />Justification / <br />ReferenceProject <br />Lu <br />r <br />t <br />o <br />n <br /> <br />Pa <br />r <br />k <br /> <br />Pa <br />r <br />k <br />s <br />Go <br />l <br />f <br /> <br />C <br />o <br />u <br />r <br />s <br />e <br />La <br />k <br />e <br /> <br />A <br />c <br />c <br />e <br />s <br />s <br /> <br />Po <br />i <br />n <br />t <br />s <br />5-Year CIP Planning Period <br />Tr <br />a <br />i <br />l <br />s <br />Eq <br />u <br />i <br />p <br />m <br />e <br />n <br />t