My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-16-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
02-16-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 3:57:08 PM
Creation date
2/17/2021 2:01:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#LA21-15 <br /> February 16,2021 <br /> Page 4 of 5 <br /> 15 Architectural Standards Final plans not developed <br /> 16 Flexibility from standards Allowed and requested <br /> 17 Traffic Studies Not suggested <br /> 18 Building Permits Expected <br /> 19 General regulations Expected <br /> applicability <br /> 20 Lighting No. Lighting plan not yet <br /> developed <br /> 21 Trails No Sidewalks or public <br /> walks proposed <br /> Roads/Drives <br /> A private road is proposed along the front of the buildings, serving each unit. This road will <br /> terminate in a pseudo cul de sac at each end. These cul de sacs are illustrated with a diameter <br /> of 40 feet,the city code requires a 50 feet radius (100 feet diameter). It is not clear of the road <br /> size offers any turn around benefit. The right of way width proposed is 45 feet,the requirement <br /> is 50. The private road is shown at 24 feet paved width,which is consistent with the City Code <br /> for private roads serving 6 or less units. The Planning Commission should provide some <br /> feedback on the cul de sac size, and the right of way width. <br /> Utilities <br /> The project can be served by municipal water and sewer. There is sanitary sewer approximately <br /> 330 feet south of project site, in the city lot. A water main is located along the subject property, <br /> in the Willow Drive ROW. Utility plans are not expected at this stage. <br /> Stormwater <br /> The proposal shows three conceptual stormwater ponds located at the East,West, and north <br /> portions of the property. While engineering is not requested at this time,the applicant has <br /> requested feedback on the expectation for stormwater management: on site,or partially off site <br /> (Exhibit E).While the adjacent city lot includes a low area wetland and may be suitable for <br /> stormwater management improvements, it is not clear from the history that the city lot was <br /> planned to accommodate stormwater from the subject parcel. The Planning Commission should <br /> confirm their expectation. It is assumed that the storm water management facilities will be <br /> maintained by the association;that assumption should also be verified. <br /> Density <br /> The 2040 Comprehensive Plan guides the property for 3-10 units per acre. The proposed 12 <br /> units fits within that range. (7 units per acre) <br /> Design <br /> The developer has provided elevations of potential buildings. These elevations suggest two <br /> story buildings with residential style pitched roof. The Planning Commission should provide <br /> some feedback regarding the expected design styles. Staff would recommend high quality <br /> materials including brick or stone in earth tones, at minimum. <br />
The URL can be used to link to this page
Your browser does not support the video tag.