Laserfiche WebLink
17. Traffic studies. City Staff is not recommending a traffic study at this time. <br /> 20. Lighting standards. Please provide a detail of the lights proposed. I assume they are LED <br /> shoebox style. <br /> 21. Trails. A sidewalk is shown is shown, proposed along the west side of Willow Drive at 5 feet <br /> wide. This will connect to an existing trail along the north side of Kelley Parkway,which is 7 feet <br /> wide. This section should also be 7 feet wide. Additionally the County will install a trail along <br /> the south side of the property, in the County Rd ROW. Connections to this trail should be <br /> provided. <br /> I will be preparing a staff report for the Planning Commission the week of February 8th. If you would like <br /> to submit any changes to the plan or provide supplemental information, please provide no later than the <br /> February 8th. Please feel free to contact me at 952.249.4626 or by email at jbarnhart@ci.orono.mn.us if <br /> you have any questions on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> cz,7 (1654—- <br /> Jeremy Barnhart, AICP <br /> Community Development Director <br /> Cc: Adam Edwards, City Engineer <br /> Mark Rausch, Engineer <br />