My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-19-2021 Planning Commission Packet
Orono
>
Planning Commission
>
2021
>
01-19-2021 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 11:06:44 AM
Creation date
1/22/2021 11:04:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Shoreline Estates <br /> Conservation Design Addendum <br /> July 20, 2020 <br /> Page 2 <br /> 2. Rural Oasis Study <br /> The proposed plan achieves the goals of the Rural Oasis study and the guiding principles have been <br /> followed. Lot layouts and street alignment utilizes most of the previously disturbed areas(house, <br /> structures,and manicured lawn)that do not have natural vegetation. Positive views of Lake <br /> Minnetonka from Shoreline Drive and other public spaces are unaffected. <br /> 3. Natural Resource Inventory <br /> a. There is no project specific addendum for this section. Lots 4 and the undisturbed areas of Lots 1- <br /> 3 are generally consistent with the MLCCS data on Map 3A-4 of the Orono Environmental <br /> Protection Plan. <br /> b. Trees are shown on the previous 2015 preliminary plat for this parcel.A tree survey has not been <br /> completed for the proposed project area.Significant trees must be identified by species,size, <br /> and location to quantify the proposed tree replacement plan. <br /> c. Delineated wetlands 5 and 6 types and boundaries appear to remain consistent with the <br /> approved wetland delineation report.The wetland delineation report expires on August 12, <br /> 2020. <br /> d. There is no project specific addendum for this section.The proposed project should adhere to <br /> the requirements and recommendations as described in this section. <br /> e. The proposed project is not located within a conceptual greenway corridor. Mapped vegetation <br /> remains consistent with the April 27, 2015 findings. <br /> 4. Conservation Design Master Plan <br /> a. There is no project specific addendum for this section.The proposed project should adhere to <br /> the requirements and recommendations as described in this section. <br /> b. Stormwater management has not been incorporated into the concept plan, but is being shown <br /> with the preliminary grading plan.Site grading will generally follow the existing conditions,with <br /> stormwater runoff draining into Wetland 5,6,and Tanager lake.Stormwater management design <br /> must adhere to the requirements described in the City of Orono Community Management Plan <br /> Part 3A, NPDES Construction Stormwater Permit, City of Orono's MS4 Permit, and Minnehaha <br /> Creek Watershed District. <br /> c. There is no project specific addendum for this section. Mapped vegetation remains consistent <br /> with the April 27, 2015 findings.The proposed project should adhere to the requirements and <br /> recommendations as described in this section. <br /> d. A tree survey has not been completed for the proposed project area,however several major <br /> trees were surveyed during the initial 2015 topographic survey(refer to Exhibit C).The proposed <br /> BRAUN <br /> INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.