My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
April 1999 Feasibility Report
Orono
>
Property Files
>
Street Address
>
B
>
Baldur Park Road
>
1340 Baldur Park Road - 08-117-23-31-0015
>
Coddon-Koseck (lake use issue)
>
April 1999 Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:43:31 PM
Creation date
1/8/2021 11:22:20 AM
Metadata
Fields
Template:
x Address Old
House Number
1340
Street Name
Baldur Park
Street Type
Road
Address
1340 Baldur Park Rd
PIN
0811723310015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Sanitary Sewer <br /> The proposed sanitary sewer for the Baldur Park area is shown on Figure 2. A review of the project <br /> site indicates the routes shown on the figures are recommended from a construction standpoint. <br /> The Baldur Park area would be served by a gravity sewer connected to the existing sewer located at <br /> the north end of Baldur Park Road. The mainline sewer would be along the gravel driveway that <br /> serves the existing home as shown on Figure 2. <br /> The sanitary sewer main would be PVC pipe, 8 inches in diameter. The proposed alignment along <br /> the existing driveway will provide less than 5-feet of cover over the pipe. Insulation would be <br /> installed above the pipe to provide protection against freezing. Sewer services would be PVC pipe, <br /> 4 inches in diameter. Service stubs would be installed to the property line or to a point 30 feet from <br /> the main. Property owners would be responsible for the installation of the service line between the <br /> service stub and the home. <br /> The proposed manholes would be constructed in the driveway. The sanitary sewer construction will <br /> require complete driveway reconstruction. The driveway will be reconstructed with 12 inches of <br /> aggregate base and geotextile stabilization fabric. <br /> An alternate design for the sanitary sewer is shown on Figure 3. This design would provide for all <br /> properties to be served by a pressure system. Each property would own and maintain a residential <br /> grinder station. Service stubs would be provided to the property line or a distance of 30 feet from <br /> the main. The property owner would be responsible for the installation of the grinder station and the <br /> service line from the home to the service stub. A cost estimate for the alternate design is included <br /> in the appendix. <br /> The project will be constructed primarily on private property. The alignments selected and shown <br /> on Figures 2 and 3 will require permanent and temporary easements to allow for construction. <br /> Detailed cost estimates for the sanitary sewer improvements are presented in the Appendices. <br /> Baldur Park Sanitary Sewer Improvements 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.