Laserfiche WebLink
II. Summary and Recommendations <br /> The construction of sanitary sewer to serve the northerly end of Baldur Park peninsula is feasible <br /> from an engineering standpoint. The project is necessary because of topography, a non-conforming <br /> septic system and proximity to the lakeshore. The capital cost as well as operation and maintenance <br /> costs have been considered in determining that the project is cost effective. The cost of these <br /> improvements are interrelated and should be assigned equitably between all properties. The <br /> following recommendations are presented for consideration by the Orono City Council: <br /> 1. That this Report be adopted as the guide for installation of sanitary sewer in the <br /> northerly end of Baldur Park peninsula. <br /> 2. That the City conduct a legal and fiscal review of the proposed project prior to the <br /> public hearing. <br /> 3e That a public hearing be held on the proposed improvements. The total estimated <br /> project cost of$75,000 should be incorporated in the public notice. <br /> There are 3 units proposed to be assessed for the trunk and lateral improvements. <br /> Baldur Park Sanitary Sewer Improvements 5 <br />