Laserfiche WebLink
July 20, 2020 page 17 <br />Secs. 82-87—82-110. - Reserved. 684 <br /> 685 <br />DIVISION 2. - PRELIMINARY SUBDIVISIONS PLAT 686 <br /> 687 <br />Sec. 82-111. - Purpose and requirements. 688 <br />(a) Purposes. During this stage, the subdivider details his their proposals and the city details the 689 <br />subdivision requirements, in the form of a preliminary plat. All basic platting determinations are made 690 <br />for all subdivisions before the council will pass on the subdivision. 691 <br />(b) Requirements. The subdivider is required to furnish detailed surveying, engineering and legal 692 <br />information sufficient to ensure compliance with the city's comprehensive municipal planCommunity 693 <br />Management Plan and chapter 78, and other local, stateState, federal, watershed or conservation 694 <br />district regulations. A preliminary plat review shall be completed for each class II and III subdivision 695 <br />proposed prior to the city's accepting any final plat application. 696 <br />(c) Prerequisite. A sketch plan review by the planning commission shall have been completed within 90 697 <br />days of the filing of any preliminary plat application for all class III subdivisions or any class I and II 698 <br />subdivisions for which the zoning administrator has required a sketch plan review. The subdivider 699 <br />shall be prepared to address or correct all problems, concerns, violations or pertinent comments 700 <br />included in the recommendations made as part of the sketch plan review. 701 <br />Sec. 82-112. - Subdivision Plat application. 702 <br />(a) Class I sPlatubdivisions. All preliminary plat applications shall provide the following to be deemed 703 <br />completeComplete class I preliminary subdivision applications shall include the following: 704 <br />(1) Completion of all items required by the Cityon the preliminary subdivision application form; 705 <br /> (2) A location map; 706 <br />(3) A half-section map; 707 <br />(4) A certificate of survey of the property 708 <br />(5) Class I subdivisions that were required to have a sketch plan review may use all required maps 709 <br />submitted with application, provided no changes have been made by the subdivider; and if 710 <br />changes have been required, new maps shall be prepared and resubmitted with preliminary 711 <br />subdivision application; 712 <br />(6) A property owner's list per public hearing requirements in section 78-48 713 <br />(2) Provision of the utilities map, if applicable; 714 <br />(3) A soil survey and report (to be requested by the city if the City Administrator or designee feels 715 <br />such information is necessary for the subdivision review); 716 <br />(4) A soil erosion and sedimentation control plan; 717 <br />(5) A vegetation preservation and protection plan; 718 <br />(67) Any additional information requested by the zoning administrator City Administrator or 719 <br />designee or planning commission; 720 <br />a. Proposed protective covenants; 721 <br />b. Statement of the proposed use of lots stating type of residential buildings with number of 722 <br />proposed dwelling units and type of business or industry, so as to reveal the effect of the 723 <br />development on traffic, fire hazards and congestions of population; or 724 <br /> 725 <br />Commented [SM45]: We should talk about this process. <br />We interchange platting and subdivision. <br />Commented [JB47]: Subdivision is the activity, plat is the <br />document. <br />Commented [JB46R45]: Nomenclature reviewed <br />Commented [JB48]: I don’t know what this means. <br />Commented [JB49]: Sketch plans should be encouraged, <br />but not required. <br />Commented [JB50]: Removed the classes of subdivision, <br />most fell under the Class 2 and 3 designation whose review <br />process was the same. The city could introduce a minor <br />subdivision, for plats that create 3 or less lots; the only <br />benefit to this would be to have a lighter review process.