My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Utilities <br />12. The service connection for lot 5 should be in the front yard, nearer the street. Revised <br />13. City Engineer comments are attached as Exhibit B. <br /> <br />Grading/ Landscaping <br />14. Please show and list all trees that will be removed due to grading and those that are anticipated to be removed <br />due to house pad preparation. Shown on grading plan <br />15. Please provide a detail of the retaining wall proposed in the front yard of lot 5. (Height/ material/ etc.) Grading <br />plan labeled. <br />16. Stormwater management plans must be submitted to the watershed district for their review and comment. <br />Noted. Pending. <br />17. The plan shows 5 rain gardens. A private covenant will be necessary guarantee maintenance of these gardens <br />in perpetuity. Noted. Number of raingardens reduced to 4. <br />18. All rain gardens will need to be installed, planted, and easements recorded prior to issuance of any building <br />permit in the subdivision. Note <br />19. Please provide a planting plan for each of the proposed rain gardens. Not provided. <br /> <br />Other/ Miscellaneous <br />20. Street trees are required. 1 tree is required per 40 feet of street frontage. The City Council has recently <br />preferred trees to be installed in natural clumps, in lieu of 40’ on center placement. Note. <br />21. As part of the final plat, the following legal documents will be required <br />a. Home Owners Association (HOA) documents to guarantee the maintenance of the rain gardens and <br />the private street <br />b. Private Covenants to guide use and house design (if desired) <br />c. Drainage and flowage easements (over wetlands) <br />d. Conservation easements (over bluff areas, at minimum) <br />e. Buffer documents (as required by watershed district) <br />f. Drainage and Utility Easements over each rain garden. Note <br /> <br />It is helpful to provide a point by point response when submitting new plans, to facilitate more efficient review by <br />Planning Commission and City Council. Please feel free to contact me at 952.249.4626 or by email at <br />jbarnhart@ci.orono.mn.us if you have any questions on the above requirements. <br /> <br />Sincerely, <br />CITY OF ORONO <br /> <br /> <br />Jeremy Barnhart, AICP <br />Community Development Director <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.