My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION <br />Monday, August 17, 2020 <br />6:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 1 of 7 <br /> <br /> <br /> <br />4. LA19-000048 WHITTEN AND ASSOCIATES O/B/O IRWIN L JACOBS 2018 <br />REVOCABLE TRUST, 1700 SHORELINE DRIVE, PRELIMINARY PLAT, 8:07 P.M. – 8:53 <br />P.M. <br /> <br />Tim Whitten and Mark Gronberg (representing the Jacobs Family Trust), Applicants were present. <br /> <br />Staff presented a summary packet of information. Barnhart added three conditions suggested by Staff <br />with approval subject to those: 1) Watershed District Approval 2) Hennepin County Approval for the <br />driveway 3) Engineering comments. <br /> <br />Ressler noted the average lakeshore setback was something he didn’t think about, and said obviously this <br />is unique in that they’re on both sides. When they’re talking about multiple sites, in looking at them <br />individually, Site No. 3 and part of Site No. 2 would by definition be lake-ward of that setback and asked <br />if that was correct. <br /> <br />Barnhart answered that based on the line currently, Lots 2 and 3 for certain are in front of that average <br />lakeshore setback as based on the current homes on either side. <br /> <br />Ressler asked if this was different because it’s an entire development, rather than a typical application <br />where it’s an individual property and the Commission has typically drawn a hard line on lakeshore <br />setback precedents. He asked if this would expose the Commission on any sort of precedents going <br />forward. <br /> <br />Barnhart said regarding most of the subdivisions adjacent to the lake, there is a prescribed average <br />lakeshore setback line because they don’t know when projects are going to be built. He noted if Lot 3 <br />was the last lot to be built on, they may not have an issue because it would be based on where Lot 2 is, <br />but again he stated they don’t know that timing and it greatly impacts what is marketable in terms of what <br />pad can a buyer look at. He said it’s not uncommon for them to do it at the time of a subdivision, as that <br />is how it was done for 690 Brown Road and for a project on Mooney Lake. He said they may set a <br />precedent but the process has already been established earlier. His suggestion is that this would only <br />apply to the initial construction. For example, Lot 3 builds a home in 2021 and they add on to it in 2050, <br />he doesn’t want to come back to find this resolution, what was the average lakeshore setback at the time. <br /> <br />McCutcheon asked what the main motivation is for not using Heritage Lane. <br /> <br />Barnhart answered that the County would prefer that all access not use County Roads, so by shifting the <br />traffic on Heritage Lane there is no new intersection on Shoreline and from that perspective the County <br />thinks that is advantageous. During the sketch plan, the Planning Commission and the City Council heard <br />pretty clearly that it was not a desirable option. <br /> <br />Ressler asked as it’s applied right now, will Heritage Lane be the primary access for this construction. <br /> <br />Barnhart answered no, access is proposed via Shoreline, there will be no vehicular connection between <br />this portion of the project in Heritage Lane. He said there will be a sanitary sewer main from Heritage <br />Lane that routes through the subdivision, but no vehicular connection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.