Laserfiche WebLink
FILE # LA20-48 <br />August 17, 2020 <br />Page 3 of 4 <br /> <br /> <br />Average Lake shore setback (ALS). The subject property has frontage on two lakes, with <br />extreme setbacks on adjacent lots, drastically impacting the ALS for the new lots. <br /> <br />The average setback for the proposed lot 6 is shown on the plat, and is influenced by lot 3 of <br />Tanager Estates (currently unbuilt) and 1100 Millston Road. Since this line is predicated on the <br />building pad site for lot 3, Tanager Estates, It is suggested that the ALS for the initial construction <br />of lot 6 be established by resolution, at the time of final plat. Without using Lot 3, Tanager <br />Estates, the setback between the lake and the principal structure at 1100 Millston Rd (appx 400 <br />feet) would establish the ALS for lot 6, effectively making Lot 6 unbuildable without variances. <br /> <br />The current Smith Bay ALS for the property is illustrated on Exhibit J. The building pads for lots <br />1, 2, and 3 will be lake ward of this existing line. Further, if lot 3 is built before lot 2, the ALS <br />setback would be based on the distance between the house at 1760 Shoreline and the lake, <br />approximately 971 feet, making lot 3 unbuildable without a variance. Staff suggests establishing <br />the ALS for the initial structure by resolution at the time of final plat, based on the generic house <br />pad location found on the preliminary plat. <br /> <br />Stormwater Quality Overlay District prescribes stormwater quality standards, a maximum amount <br />of hardcover on a given lot. The subject parcel is in Tier 1, due to its proximity to Tanager and <br />Lake Minnetonka. Upon subdivision, each lot will be assigned a Tier. These assignments have <br />not been completed. It is anticipated that lots 1 - 6 will be Tier 1 (25%) and lot 7 may be Tier 2 <br />(30%). Tier assignments will be made as part of the final plat. <br /> <br />All lots proposed are greater than 2.0 acres and are exempt from the structural coverage <br />limitation. <br /> <br />Parks. The plan does not include any park area. Park dedication will be satisfied by a cash donation <br />for the 6 new lots. <br /> <br />Landscaping. The applicant has not yet provided a landscaping plan. The subdivision code does <br />require one shade tree per 40 feet of right of way. Staff recommends the trees be planted in clumps, <br />a more natural effect rather than the traditional linear pattern found in suburban subdivisions. <br /> <br />Fees. The following fees are anticipated for this proposed subdivision, to be due at the time of <br />Final Plat approval, subject to the fee schedule applicable at that time. <br /> <br /> <br /> <br /> <br /> Per Lot fee x <br />Number <br />of New <br />lots =Total fee <br />Stormwater Truck Fee 8,060.00$ 6 48,360.00$ <br />Sanitary sewer Connection 5,380.00$ 6 32,280.00$ <br /> SAC fees also due at time of <br />Permit <br />Park dedication 5,550.00$ 6 33,300.00$ <br />Total Fees 113,940.00$