Laserfiche WebLink
<br /> <br />Page 3 <br /> <br /> <br /> <br />12. On that same sheet, the access for lot 1 is shown through the infiltration basin. <br />Response: The driveway has been relocated to avoid the infiltration basin. <br /> <br />13. On Sheet C5.02, the erosion control plans are prepared to address erosion control during <br />construction. Has a plan been prepared for demolition activity? <br />Response: Erosion control measures have been added to the phase 1 erosion control plan to <br />address the demolition phase of the project. <br /> <br />14. Please provide a document that better illustrates the removed trees. <br />Response: Please refer to sheet L3.01 for planned tree removals. <br /> <br /> <br /> <br />Please let us know if you have any additional questions or comments at 763-476-6010. <br />Sincerely, <br /> <br />Sambatek, Inc. <br /> <br /> <br />Eric T. Luth