My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-14-2020 Council Packet
Orono
>
City Council
>
2020
>
09-14-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2020 11:35:52 AM
Creation date
12/1/2020 11:23:34 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br /> <br />NO. ________________________ <br /> <br /> <br />2 <br /> <br />NOW, THEREFORE, BE IT FURTHER RESOLVED that the City Council of <br />Orono, Minnesota hereby approves the Comprehensive Plan Amendment based on one or more of <br />the following findings of fact concerning the Property: <br /> <br />FINDINGS OF FACT: <br /> <br />1. This application was reviewed as Zoning Files #LA20-000030 (Preliminary Plat) and <br />LA20-000050 (Comprehensive Plan Amendment). The analysis contained within staff <br />memos and the exhibits attached to the aforesaid memos, all minutes from the above <br />mentioned meetings, and any and all other materials distributed at these meetings are <br />hereby incorporated by reference. <br /> <br />2. The Property is located in the RR-1B Zoning District. <br /> <br />3. The property is guided for Low Density Residential in the 2040 Community Management <br />Plan. <br /> <br />4. The Property contains 39.4 acres in area. <br /> <br />5. The parcel will be subdivided into 5 buildable lots and platted right of way. All lots <br />conform to the size requirements of the city code, the City Council supports flexibility in <br />determining lot width for lots 1 and 2. <br /> <br />6. The Developer has prepared grading plans to manage stormwater on site without negatively <br />impacting adjacent parcels. <br /> <br />7. Access to the property is via the existing Orono Orchard Road, a public street. <br /> <br />8. The Parks, Trails and Open Space element of the Orono Community Management Plan <br />(CMP) has no current plans for parks that specifically require dedication of park land from <br />this property. <br /> <br />9. The developer has submitted a Conservation Design Master Plan prepared by Sambatek <br />dated April 22, 2020 that inventories and describes in detail the environmental features of <br />the site, defining what natural values of the site should be preserved or enhanced and how <br />that should occur. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.