Laserfiche WebLink
July 20, 2020 page 17 <br /> 679 <br /> (12) The final plat. Record plat drawings shall be prepared by a registered land surveyor in 680 <br />accordance with applicable statute and county regulations and shall be submitted in the form of 681 <br />at least two plastic film reproducible copies, three copies for Torrens property. Original signatures 682 <br />and certifications shall be provided on the mounted and reproducible copies for the owners, those 683 <br />possessing any other property interest, the professional engineer (if applicable), and the registered 684 <br />surveyor. Spaces for certification by the city (signature lines for the mayor and clerk) shall be 685 <br />provided. 686 <br />(13) One copy of the final plat reduced to a scale of one inch equals 200 feet. 687 <br />(d) Application deadlines. The subdivider shall file a complete final plat application with the City 688 <br />Administrator or designee within one year of preliminary plat approval. 689 <br />Sec. 82-143. - Staff review of the final plat. 690 <br /> 691 <br />(a) Coordination. The City Administrator or designee shall coordinate the review of final plat 692 <br />applications. 693 <br />(b) Referral to city staff. 694 <br />(1) The City Administrator or designee shall refer the application to all appropriate city staff 695 <br />personnel for review and certification. 696 <br />(2) The City Administrator or designee shall review the final plat application for conformity with 697 <br />chapter 78 and this chapter and with the conditions and requirements of the preliminary plat 698 <br />approval, and shall certify their status to the council. 699 <br />(3) The city attorney shall review the record plat drawing, metes and bounds descriptions, 700 <br />easements, deeds, covenants, agreements and other documents for proper legal form, proper 701 <br />representation and complete execution by all required parties, all to uphold the interests of the 702 <br />city, and shall certify the approval to the council. 703 <br />(4) The city engineer shall: 704 <br />a. Review the record plat drawing, metes and bounds description, easements, deeds, agreements 705 <br />and other documents for proper and complete legal property descriptions; 706 <br />b. Review and approve all construction plans; 707 <br />c. Approve all construction estimates for work required to be completed after final plat 708 <br />approval; 709 <br />d. Issue, when completed, certificates of satisfactory completion for all work required to be 710 <br />completed prior to final plat approval; and 711 <br />e. Certify the approval and/or status of the above to the council. 712 <br />(5) The city finance director shall review all final plat applications as to tax status of the property; 713 <br />the original, outstanding and proposed special assessment amounts levied; and the payment and 714 <br />status of all fees or charges imposed on the property; shall prepare all special assessment 715 <br />reapportionments; and shall certify the above to the council. 716 <br />(6) Additional comments by other city staff personnel shall be submitted in writing to the City 717 <br />Administrator or designee for inclusion in the record. 718 <br />(c) Requirements of other agencies. The subdivider shall submit to the city all written confirmation of 719 <br />official action taken by governmental agencies or jurisdictions subsequent to the approval of the 720