My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01098 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3205 Graham Hill Road - 05-117-23-14-0065
>
Septic
>
2012-01098 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:18:51 PM
Creation date
7/10/2020 11:24:08 AM
Metadata
Fields
Template:
x Address Old
House Number
3205
Street Name
Graham Hill
Street Type
Road
Address
3205 Graham Hill Rd
Document Type
Septic
PIN
0511723140065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. w.., <br /> � � <br /> . OSTP Pressure Distribution <br /> UNIVERSITY ` <br /> Minnesota Pollution Design Worksheet OF MINNESOTA <br /> Control A enc �-�,r�s <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Laterals in system/zone: �� _------- <br /> (2 feet is minimum ond 3 feet is maximum spacing) "'""""''""`"'"' <br /> �� �; '� r ` <br /> 2. Select Perforotion Spacing: 3.0 ft "" . . , ,'S�, �, -- <br /> � �� <br /> ^ Mmi���uin <br /> �� '/."pe�tor:�trnnv s�i.��i�d 3''.�µvt 1").•ol rock � � �7- <br /> 3. Setect Perforation Diameter Size 7/32 in _ _ <br /> G"�trock <br /> 4. Length of Latera(s =Media Bed Length -2 Feet. �������.,����� nJ:'1"to b�" Perbr.nion tp.innq'Z'��; - <br /> 63 - 2ft = 61 ft Perforotion can not be c(oser then 1 foot from edge. <br /> 5• Determine the Number of Perforotion Spoces. Divide the Length of Laterols (Line 4)by the Perforation Spncing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- ��ft = 20 Spaces <br /> 6. Number of Perforations per Latera( is equal to 1.0 ptus the Number of Perforation Spaces (Line 5). <br /> Perforations Per lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforotions per(atera(guarantees less than o 10%discharge variation. The value is <br /> doub(e if the a center monifold is used. <br /> Maximum Number of Perfaations Fer LaLeraf to Guarantee<1U�e Distharge Yariatiar► <br /> :`i{ncn Fertc�ra:ions 7/32 Incn Perforations <br /> Pipe Diameter tlnchesl Re+iaratio�Spacing Pipe Diameter pnches) <br /> Ferforat��Spacing IFeet) 2 � <br /> t 1�: ti': 2 3 (Feetl ! 4t': it, <br /> z iQ t3 18 30 b0 2 11 16 1t 34 68 <br /> Z�� � 12 tb 2B 54 2'r 10 13 20 32 64 <br /> 3 8 i2 1b 25 51 3 9 14 19 30 64 <br /> 3-'16 inch Perforatic�ns i/8 Inch Perforatians <br /> Fipe Oiame.er(Inchesl Fesforation Spacing Pipe Qiameter finches) <br /> Ferforatro�Spac�ng IFeet) <br /> 1 1�'i 1�< Z 3 i.Feetl I 1YS 1t: 2 3 <br /> 2 12 4$ 2b 46 87 2 2t 33 44 74 149 <br /> t�4 12 17 14 40 8Q 2� 20 30 4f 69 135 <br /> 3 12 16 22 37 75 3 20 t9 38 b4 128 <br /> 7• Total Number of Perforations equals the Number of Perforations per Laterol (Line 6)multiplied by the Number of <br /> Perforated Latera(s (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended va(ue is 4-10 ft z per perforation. �����n,.����, <br /> PorMracbn Dfameter <br /> Does not apply to At-Grades ��d�«� <br /> ,,, ,,, >,. ,, <br /> Bed Aree = Bed Width (ft)X Bed Length(ft) ,.o• o.,, o.., 0.56 0.�, <br /> 1.S 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 fc2 Z°° °.� °." °.°° ,.°� <br /> 2.5 0.29 0.65 0.89 f.17 <br /> 3.0 0.�2 0.72 0.98 i.28 <br /> Square Foot per Perforation =Bed Area divided by the Totol Number of Perforations (Line 7). 4.0 0.�� o.g3 ,.�3 ,..� <br /> 5.0 p.4f 0.93 1.26 1.65 <br /> Dwellings wi[h S/16 irxA[0//e inch <br /> 630 ft2 � 63 perforations � ��.� ft2/perforations �f�t v��oratiom <br /> Drrellingt wich I/8 vxh pertoratiors <br /> Z(eet OthCf C.[aWiS�ment5 Lnd MSTS wStA 3/16 <br /> 9. Select Minimum Average Head: 1.0 fL inch to v4 irtch perto�atiorrs <br /> 5��` Ocher gtaOlishments and N5T5 with�/8 inch <br /> peAoratb�n <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Tota!Number of Perforotions (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.