My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01098 - septic mound system
Orono
>
Property Files
>
Street Address
>
G
>
Graham Hill Road
>
3205 Graham Hill Road - 05-117-23-14-0065
>
Septic
>
2012-01098 - septic mound system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:18:51 PM
Creation date
7/10/2020 11:24:08 AM
Metadata
Fields
Template:
x Address Old
House Number
3205
Street Name
Graham Hill
Street Type
Road
Address
3205 Graham Hill Rd
Document Type
Septic
PIN
0511723140065
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' �' -�- ;; <br /> OSTP Mound Materiats Worksheet UNIVERSITY � <br /> Minnesota Pollution OF MINNESOTA � ti�J?, <br /> Control Agency <br /> ProjectlD: v 11.09.22 <br /> A. Catculate Bed (rock)Volume:Bed Length (2.0 X Sed Width 2.8)X Depth =Volume ft3 <br /> 63.0 ft x 10.0 ft X �.o = 630.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 630.0 ft' : 27 = 23.3 yd' <br /> Add 20%for constructability: 23.3 yd'X 1.2 = 28.0 yd' <br /> B. Calculate Clean Sond Votume: <br /> Votume Under Rock bed:Avernqe Sand Depth x Media Width x Medio Length =cubic feet <br /> 2.4 ft x 10.0 ft x 63.0 ft = 1522.5 ft' <br /> For a Mound on a slope from 0-1% <br /> Votume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = �� <br /> Volume from Width�((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Tota(Clean Sand Volume:Volume from Length+Volume from Width+Volume Under Medio <br /> ft; * ft3 + ft3 _ ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Lenqth)+2=cubic feet <br /> (( 3.7 ft -�) x 3.o ft x 63.0 )�z= 252.0 ft' <br /> Downslope Volume:((Downslope Height- f)x Downslope Absorption Width x Media Length)y 2=cubic feet <br /> (( 5.2 ft-t) x 10.0 ft X 63.0 )*2= 1312.5 ft' <br /> Endslope Volume:(Downslope Mound Height- i) x 3 x Media Width =cubic feet <br /> ( 5.2 ft-1 ) X 3.0 ft X 10.0 ft = 125.0 ft' <br /> Tota1 Clean Sand Volume:Upslope Volume +Downslope Volume +fndstope Volume +Volume Under Media <br /> 252.0 ft' + 1312.5 ft' + 125.0 ft' + 1522.5 ft'= 3212.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 3212.0 ft' � 27 = 119.0 yd' <br /> Add 20%for constructabitity: 119.0 yd X 1.2 = 142.8 <br /> ' yd3 <br /> C. Calcutate Sandy Berm Volume: <br /> Total Berm Volume(opprox):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)-*2=cubic feet <br /> ( 4.4 _ 0.5 )ft x 48.0 ft x 93.0 )T 2= 8742.0 ft' <br /> Total Mound Volume-Clean Sand volume-Rock Vo(ume=cubic feet <br /> 8742.0 ft' _ 3212.0 ft' - 630.0 fc' = 4900.0 ft' <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 4900.0 ft' = 27 = 181.5 yd3 <br /> Add ZO%for constructability: 181,5 yd3 X 1.2 = 217,$ yd' <br /> D. Calculate Topsoil Moterial Volume:Totat Mound Width X Tota!Mound Length X.5 jt <br /> 48.0 ft x 93.0 ft x o.s ft = 2232.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2232.0 ft3 = 27 = 82.7 yd' <br /> Add 20%for constructabitity: 82.7 yd' x �.z = 99.2 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.