Laserfiche WebLink
1532 (2) Drainage easements. <br /> 1533 a. Where topography or other conditions are such as to make impractical the inclusion of <br /> 1534 drainage facilities within road rights-of-way, perpetual unobstructed easements of an <br /> 535 appropriate width at least 15 feet in width for such drainage facilities shall be provided across <br /> 1536 property outside the road lines and with satisfactory access to a public roadway.Easements <br /> 1537 shall be indicated on the plate if.ubdivision is a pint.Drainage easements shall be carried <br /> 1538 from the road to a natural watercourse or to other drainage facilities. <br /> 1539 b. When a proposed drainage system will carry water across private land outside the <br /> 1540 stibilikLisiectplat,appropriate drainage rights must be secured and indicated on the plan if the <br /> 541s-a-plat. <br /> 1542 c. The subdivider shall dedicate,by drainage or conservation easement of land on both sides of <br /> 1543 existing watercourses,to a distance to be determined by the city. <br /> 544 d. Wetlands, swamps and low lying lands along watercourses subject to flooding or <br /> 545 . • ,s _ , • . ..-. •• .. . -. •. . .. <br /> 546 . - - -- - _. . . . . _ . ..• •- .. . ': <br /> 547 <br /> 548 <br /> 549 ;:. <br /> - c '- ••-• -•••- - '• - /' Commented[1690]:We already define lot area. Can this <br /> 1550 Sec.82-223.-Water facilities. be removed? <br /> 1551 (a) Public water systems. <br /> 1552 (1) Where a public water main is accessible,the subdivider shall install adequate water facilities, <br /> 1553 including fire hydrants,subject to the specifications of the stateState or city. <br /> 1554 (2) Water main extensions shall be approved by the city. <br /> 1555 (3) To facilitate the provisions of subsections(a)(1)and(2)of this section,the location of all fire <br /> 1556 hydrants and all water supply improvements and all improvements proposed to be served shall be <br /> 1557 shown on the preliminary subdiv-isionplat,and the cost of installing such improvements shall be <br /> 558 included in the performance bendBond to be furnished by the subdivider. <br /> 1559 (b) Individual wells. <br /> 1560 (1) In the discretion of the city,if a public water system is not available,individual wells may be <br /> 1561 used.Water samples shall be submitted to the stateState health department for its approval. <br /> 1562 (2) If the city requires that a connection to a public water main be eventually provided as a condition <br /> 1563 to approval of an individual well,the subdivider shall make arrangements for future water service <br /> 1564 at the time the subdivisionplat receives final approval. <br /> 1565 Sec.82-224.-Sewerage facilities. <br /> 1566 (a) General requirements. Where public sanitary sewer is available,the subdivider shall install sanitary <br /> 1567 sewer facilities in a manner prescribed by the city's construction standards, specifications and <br /> 1568 provisions of this Code. All plans shall be designed in accordance with the rules, regulations and <br /> 569 standards of the city, stateState health department, and other appropriate agencies. Plans shall be <br /> 570 , <br /> 1571 (b) Connection. Where a public sanitary sewerage system is reasonably accessible,the applicant shall <br /> 1572 connect the system and provide sewers accessible to each lot in the subdivisionplat. <br /> 573 (c) Central system.In the Metropolitan Urban Service Area(MUSA),wWhere public sanitary sewerage <br /> 1574 systems are not reasonably accessible but will become available within a reasonable time (not to <br /> 1575 exceed 15 years),the applicant may choose a central sewerage system.The maintenance cost shall be <br /> June 15,2020 page 36 <br />