Laserfiche WebLink
April 23,2018 <br /> 2635 Casco Point Road <br /> Page 2 of 2 <br /> Also, please be note the following: <br /> a. The new driveway requires paving from the roadway for a minimum of 30 feet in order to reduce <br /> driveway run-off from depositing soil and debris onto the roadway. Orono City Code Section 18-136(f). <br /> b. The water service connection must be protected during construction. Damage to the service line will <br /> be the responsibility of the builder to repair prior to approval of the utility permit and issuance of the <br /> certificate of occupancy. <br /> c. A separate utility permit will be required for sewer and water disconnection and connections. <br /> d. Special care will need to be exercised in creating the drainage pattern on the sides of the property to <br /> ensure that runoff is not directed onto the neighboring properties. <br /> Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any questions on <br /> the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> Ofitifik)NON- <br /> Christine Mattson <br /> Planning Assistant <br /> c via email Jim Cleary <br /> Patricia Webber <br /> Sharrett Design <br /> Otto Associates <br /> Roger Peitso, Building Official <br /> enclosure <br />