My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01654 - plumbing
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2380 Shadywood Road - 17-117-23-44-0111
>
Permits/Inspections
>
2017-01654 - plumbing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:46:20 PM
Creation date
5/6/2020 10:49:19 AM
Metadata
Fields
Template:
x Address Old
House Number
2380
Street Name
Shadywood
Street Type
Road
Address
2380 Shadywood Road
Document Type
Permits/Inspections
PIN
1711723440111
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Redmonds Office Buildout <br /> Orono,MN <br /> Sanitary Piping Materials <br /> 1. Hub-And-Spigot,Cast-Iron Soil Pipe and Fittings—ASTM A 71,service class <br /> 2. Gaskets—ASTM C 564, rubber <br /> 3. Hubless, Cast-Iron Soil Pipe and Fittings—ASTM C 1277 and CISPI 310 <br /> 4. Heavy-Duty,Hubless-Piping Couplings—ASTM C 1277 and ASTM C 1540 <br /> 5. Solid-Wall PVC Pipe—ASTM D 2665,drain,waste and vent <br /> 6. Cellular-Core PVC Pipe—ASTM F 891,Schedule 40 <br /> 7. PVC Socket Fittings—ASTM D 2665,made to ASTM D 3311,drain,waste and vent patterns and <br /> to fit Schedule 40 pipe. <br /> 8. Adhesive Primer—ASTM F 656 <br /> 9. Solvent Cement—ASTM D 2564 <br /> Piping Tests <br /> a. Test for leaks and defects in new piping. If testing is performed in segments,submit separate <br /> reports for each test. <br /> b. Leave uncovered and unconcealed new drainage and vent piping until it has been tested and <br /> approved. <br /> c. Rough-in Plumbing Test Procedure: Test drainage and vent piping except outside leaders on <br /> completion of roughing-in. Close openings in piping system and subject to 5 psi air test for 15 <br /> minutes. Inspect joints for leaks. <br /> d. Finished Plumbing Test Procedure: After plumbing fixtures have been set and traps filled with <br /> water,test connections and prove they are gastight and watertight. Plug vent stack openings on <br /> roof and building drains where they leave building. Introduce air into piping system equal to <br /> pressure of 1-inch wg. Use U-tube or manometer inserted in trap of water closet to measure <br /> this pressure. Air pressure must remain constant without introducing additional air throughout <br /> period inspection. Inspect plumbing fixture connections for gas and water leaks. <br /> e. Repair leaks and defects with new materials and retest piping,or portion thereof,until <br /> satisfactory results are obtained. <br /> f. Prepare test reports and required corrective action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.