Laserfiche WebLink
2. Drivew�y Access. Driveway access to Lots 1 and 3 shall Ue a shared driveway <br /> within Outlot A. Driveway access to Lots 4 and 5 shall be a shared driveway <br /> within Outlot B. The e�:isting driveway �ccess onto Shadywood Road for Lot 2 <br /> shall remain. All other curb cuts or access points onto the adjacent Coluity Roads <br /> shall be reinoved. The developer shall establish the appropriate shared driveway <br /> easements and maintenance covenants over Outlots A and B. Developer shall <br /> provide copies of approved Heiulepin County permits for driveway access <br /> locations for OLrtlots A and B. <br /> 3. Municipal Sewer. The property was conlpletely assessed for nnmicipal sewer on <br /> a front footage basis as pat�t of the 1965-LS-lA project, and no fiuther sewer <br /> colulection charges are required (MCES SAC charges will be due for each of Lots <br /> 3 and 4 at the time building pei�mits are issued; Lot 1 is credited for 1 SAC unit <br /> due to the recent removal of the eaisting house which was connected to sewer). <br /> 4. Municipal Water. The property was assessed for complete front footage but <br /> only 3 water units as part of the 1970-LW-lA municipal water project, hence 2 <br /> additional water units will be due prior to final plat approval at a cost per the 2005 <br /> fee schedule of$2,520.00 per unit, or $5,040.00 total. <br /> 5. Development Fees <br /> A. Park Dedication Fee. The subdivision is subject to the standard Park <br /> Dedication Fee requirement. Because the value of each newly created lot is <br /> eapected to be in excess of the threshold value of$69,375.00, the 8% park fee cap <br /> of$5,550 per lot will apply. A P�rk Dedication Fee will be due for Lots 3 and 4, <br /> calculated as follows: <br /> 2 lots x $5,550/lot = $11,100. <br /> B. Storm Water and Draina�e Trunk F'ee. The subdivision is subject to the <br /> standard Storm Water aud Drainage Trtullc Fee, established in the 2005 fee <br /> schedtile as $4,160 per acre for the '/2 acre zone. The Storm Water Drainage and <br /> Truiilc Fee is calculated as follows: <br /> 3.85 gross acres x $4,160/acre = $16,016. <br /> Page 4 oI'9 <br />