My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-13-2006 Council Packet
Orono
>
City Council
>
2006
>
02-13-2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:00:59 AM
Creation date
7/13/2015 1:33:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. Development Fees <br /> A. Park Dedication Fee. The PRD is subject to the standard Park Dedication Fee <br /> requirement. Because the value of each newly created lot will be in excess of the <br /> threshold value of$69,375.00 the 8% park fee cap of$5,550 per lot will apply . <br /> Park dedication fee will be 6 lots x $5,550 = $33,300. <br /> B. Storm Water and Drainage Trunk Fee. The PRD is subject to the standard Storm <br /> Water and Drainage Trunk Fee of$2,770 per acre x 16.7 gross acres = $46,260. <br /> 10. City Engineer Approval. Approval is subject to the ongoing recommendations of the <br /> City Engineer. <br /> 11. Plans and Specifications. The following plans and specifications shall be submitted for <br /> review and approval by the City and other appropriate jurisdictions, to ensure that the <br /> proposed plat will accomplish the intended purposes: <br /> a) Final plans and specifications for all proposed utility lines and services, including <br /> proposed revisions, if any, to existing service facilities. <br /> b) Final grading, drainage and erosion control plan showing existing and proposed <br /> contours, building locations, elevations, stormwater facilities and calculations, <br /> utilities and erosion control measures to be used during construction. Final Plat <br /> Approval will not be granted until the Minnehaha Creek Watershed District has <br /> approved the stormwater management plans. <br /> c) Engineering details and design for any proposed retaining walls. <br /> d) Pinal Uoulevard landscaping design plan with planting schedules including <br /> ntunbers and species, in accordance with the boulevard landscaping requirements <br /> of the subdivision ordinance. <br /> e) Road construction plans inclttding proposed plan and profile views, typical street <br /> section, geotechnical report, R-value recommendation and pavement design. <br /> � Sufficient detail to meet the recommendations of the City Engineer. <br /> Page 8 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.