Laserfiche WebLink
#05-3152 � <br /> December 6,2005 <br /> P�ge 2 <br /> At the regular meeting of October 24, 2005 Che City Couilcil reviewed the slcetch plan and <br /> indicated that the PRD process would be acceptable, suUject to 1;he �.pplicaut addressing the <br /> City's Conserv�tion Desigiz goals and objectives, a.nd subject i:o c�refi.il review th�.t all <br /> standards necessary to enstue a successful clevelopment are niet, <br /> The applicant subsequently engaged the services o:C a consulting ecologist, Applied <br /> Ecological Services (AES) to address tl�e Conservation Design goals and objectives. On <br /> November 18, 2005 applicant submittec� the ecological findii�gs aud recoilullendltioils as <br /> well as on-site sewage ireal;ment systems inforrnation, niaking the applicai:ion complete and <br /> formally coninlencing the 120-day review period. The topics aciclressed by AES include <br /> forest preservation; forest ei�llanceilient and expansion; wetland preservation; wetland <br /> replacenient ancl el�tzailcenienl:; vegetated buffer establishnlent; stornlwater inauagement; <br /> and ecological restoration and illanagement. It would be appropriate and desirable that the <br /> developer adhere to the AES reconunendatioiis. <br /> The City's wetland consultant, Jolui Smyth of Bonestroo & Associates, has provided <br /> conu�leilts with regard to wetlands on the site, specifically witl�. regards to the locatioil of <br /> the eaisting creek draulage easeinent as compared to the actual creek location, and with <br /> regards to potential impacts to the wetland of the proposed storinwater treatment pond. It <br /> would be appropriate that lus concenis be addressed as part of a comprehensive stormwater <br /> and wetlaild management plan for the site. Additionally, because cei�tain elements of the <br /> proposed ponding plan involve fill or excavation in eYisting wetlands, review and approval <br /> by the Mii�nehal�a Creek Watershed District is ilecessary. <br /> All proposed lots have been tested and found capable of providiiig suitable primary and <br /> alternate sites for on-site sewage treatLnent systems. For all lots, mound systems will be <br /> required. Oi�.Lots 1, 2 aizd 3, Block 1 ancl Lot 2, Block 2,treatment sites are relatively near <br /> the pro�osed house locations, aiid may limit the location or exteiit of poteiitial fitture <br /> amenities. Special precautions must be taken to protect these sites on both a short-term and <br /> Io11g-tenn basis, since muizicipal sewers are izot proj ected to be extended to serve this area <br /> of Orono. <br /> Planninb Commission Recomme�idation <br /> The Platuling C0111i1115S1011 on Novenlber 21, 2005 reviewed the �pplication aud <br /> recommended on a vofie of 6-0 th�t tlie Council grant Platuled Reside�ltial Developinent <br /> (PRD) prelinliziary plat approval subject to: 1) iilcorporatioi� into plans ol all of the <br /> recom��lendations o� �lpplied Ecological Services reg�rdiilg conserv�.tio�l design, <br /> landscaping, etc.; 2) applicant to adclress conzmei�ts by City wetland C0115t11t�111� JO�lll <br /> Slll�ll; 3� C0115�1'V�1i1011 Ec1S0111e111: �:0 be 1'eClllll•ed over east end of Lots 1-2-3 Block 2 �s <br /> well as over Outlot B; �nd 4) addition�l conditions with regards to covenants fo��protection <br /> of septic sites on small loi:s, etc, be addressecl. <br />