Laserfiche WebLink
f <br /> � <br /> 4. Long Lake agrees that it will provide 350 units of sewer capacity to serve other <br /> properties in Orono as and when the properties connect to the sewer line. The properties that <br /> connect to this sewer line wi11 be treated in the same way as other properties in Orano that have <br /> cannected to Long Lake sewer lines. Long Lake will charge a connection fee of$3,45d per unit, <br /> which includes a Metro SAC charge of$1,200, to connect to the sewer system. This fee is <br /> consistent with the 2002 Fee Schedule as adopted by the City Council. The Orono properties that <br /> corulect to the Long Lalce sewer line will not pay any other one-tune or on-going fecs. Long <br /> Lake will receive a credit frorn the MCES for the sewer flow from the Orono properties, and <br /> 4rono will be charged by MCES for tlus flow. Orono shall be responsible for rnaintenance of a11 <br /> of the laterals and service taps and Long Lake shall be responsible for the maintenance of the <br /> primary system. <br /> 5. Th�Minnesota Department of Transportation has agreed to pay the full cost of <br /> constructing a watex Izne to serve the fire station. The water line will cross the Parcel <br /> approximately as shown by Exhibit A. The Parties agree that the waterline is available to serve <br /> the autlot on the parcel as shown on Exhibit A. Long Lake will charge a connection fee of <br /> $2,700 per unit for residential properties to connect to the water system. This fee is consistent <br /> with the 2002 Fee Schedule as adopted by�lle City Coimcil. Long Lake agrees to provide water <br /> service to this Iot and charge a quarterly water service fee consistent with the rates established by <br /> the City Council for properties outside of the City of Long Lake. Long Lake also a�rees that if <br /> tliere is sufficient capacity in the Long Lake water system, and water service is requested,water <br /> service will be made available to the properties in Orono on the east side of Willow Drive <br /> between Watertown Road and lhe new Highway 12, to the properties in the Hackberry <br /> neighborhood that ciu-rently receive sewer service through Lang Lake, and to the properties on <br /> Woodhaven Drive. These properties wauld be charged a eonnection fee and quarterly water <br /> service fee consistent with the Fce Sclledule as adopted by the Long Lake City Council at the <br /> time of the connection. Long Lake shall meter water service with a large capacity main line <br /> meter. Orono sha11 be responsible for maintenance of all of the laterals and seivice taps and <br /> Long Lake shall be responsible for the maintenance of the primary system. <br /> 6. The Pa.rties agree thai the Parcel has been platted as shown in Exhibit A, and that <br /> the outlot wi11 be under the sole ownership and control of the city of Orono. The Parties agree <br /> that the fu�e station sits on approximately 2.04 acres of land as shown by tl�e plat,that the right of <br /> way for the public road setving the fire station is approximately,42 acres, and that the wetland <br /> initigation area and storm water ponding area provided for the fire station is approxirnately.68 <br /> acres. The Parties agree that this configuration is consistent with the Agreement of August $, <br /> 2001, in which the Parties determined that the fu•e station site will be"approximately three <br /> acres." <br /> HC26D54/4707/26554974.v1 2l26@002 page 2 of 3 <br />