Laserfiche WebLink
� <br /> Lift Station 12 Project Cost Estimate 4/13/2010 <br /> Item <br /> No. Item Units Qty Unit Price Total <br /> Part 1: Gravity Sewer Improvements <br /> 1 Rock Construction Entrance EA 1 $ 2,000 $ 2,000 <br /> 2 Remove Existing Bituminous Dwy SY 160 $ 5 $ 800 <br /> 3 Install Bituminous Dwy SY 160 $ 35 $ 5,600 <br /> 4 Abandon Ex Sanitary Sewer LF 260 $ 10 $ 2,600 <br /> 5 Abandon F�c Sanitary Sewer Manhole EA 1 $ 2,500 $ 2,500 <br /> 6 8" PVC Sanitary Sewer, SDR 35 LF 15 $ 100 $ 1,500 <br /> 7 Connect to Ex. Sanitary Structure EA 2 $ 3,000 $ 6,000 <br /> 8 Reconstruct Ex Sanitary Sewer MH Invert EA 1 $ 500 $ 500 <br /> 9 Silt Fence LF 150 $ 3 $ 450 <br /> 10 Restoration SY 200 $ 5 $ 1,000 <br /> Total Part 1: Gravity Sewer Improvements $ 22,950 <br /> Part 2: Lift Station <br /> 11 Lift Station including pumps, plumbing, and <br /> valve vault LS 1 $ 110,000 $ 110,000 <br /> Total Part 2: Lift Station $ 110,000 <br /> Total Part 1 $ 22,950 <br /> Total Part 2 $ 110,000 <br /> Subtotal $ 132,950 <br /> 25% Contingencies, Legal, Engineering, Admin., Etc. $ 33,238 <br /> Total $ 166,188 <br /> *Cost assumes existing wet well and forcemain are salvageable and can be reused. <br />