Laserfiche WebLink
SEP. 13. 200b 11 :40AM Mail �DINA RL I ?IT E CLAIMS N0. 2964 P. 37/59 <br /> ARTICLE III <br /> ARCHITECTURAL T,CONTROL <br /> Section 1. Approvals. No Dwelling Unit, building,structure,addition,driveway, <br /> sidewalk,wall,fence, garage, aerial,antenna,wire, pipe, mailbox, mailbox stand, exterior <br /> ornament, swimming pool, landscaping, or other structure or foliage (hereinafter <br /> collectively "Improvements") shall be commenced, constructed, altered, improved or placed <br /> upon a Lot without the Architectural Control Committee's prior,written approval of(a)the plans <br /> and specifications for said Improvements,including site location thereof, and(b)the,contractor <br /> who will actually construct the Improvements. Adclitional design and landscaping covenants are <br /> attached hereto as Exhibit B. <br /> Section 2. Submission of Information. Before construction of any Improvements is <br /> commenced, an Owner shall submit to the Committee at the address to be provided to Owners by <br /> the Homeowners Association two(2) complete sets of architectural plans and specifications for <br /> the proposed.Improvements (including,without limitation,full site plans, elevations, floor plans, <br /> exterior materials, exterior colors, driveway plan, and Iandscape plan)along with the name, <br /> address and telephone number of the contractor who will actually perform the proposed work and <br /> the name, address and telephone number of the Owner. Upon request by the Committee, an <br /> Owner shall submit such additional information as shall reasonably be requested by the <br /> Committee to evidence compliance with the requirements of this article. <br /> Section 3. Review Peiiod. Within twenty (20) days of its receipt of all of the <br /> documents to be submitted under Section 2 of this Article, the Committee shall either approve or <br /> disapprove the plans and specifications for the proposed Improvements and the contractor who <br /> will construct the proposed Improvements, The Committee may disapprove only for one or more of <br /> the following reasons.- <br /> (a) <br /> easons:(a) The Committee shall have determined, in its sole discretion,that the contractor does <br /> 5 <br />