My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-24-2009 Council Work Session Packet
Orono
>
City Council
>
2009
>
03-24-2009 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 2:52:23 PM
Creation date
7/8/2015 2:52:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6/5/2007 Review letter from Darren Amundsen. Issues identified: <br /> • More detail required of system for piping roof runoff to ditch in street <br /> right of way. <br /> • Runoff from driveway should be contained on lot and discharged to ditch <br /> in street right of way. <br /> • The area on plan described as a sediment basis should be a rain garden. <br /> 6/5/200707 Turner emailed Amundsen"s review letter to Kurth <br /> 6/6/2007 Revised grading plan received from Kurth. Emailed to Amundsen. <br /> 6/12/2007 Review letter from Amundsen. Issues identified: <br /> • More detailed storm sewer design and runoff analysis must be submitted. <br /> • More detailed rain garden design should be required prior to issuance of <br /> building permit. <br /> 6/18/2007 Planning Commission recommended approval conditioned on: <br /> 1. Approval of the final drainage plan by the City Engineer before the <br /> application is considered by the City council <br /> 2. The driveway being paved. <br /> 6/19/2007 Applicants notified of Planning Commission's recommendation by letter. Kurth <br /> notified by fax. 6/25 deadline specified for receipt of grading/drainage plan for <br /> 7/9 City Council meeting <br /> 6/26/2007 Turner notified applicants by letter that deadline for 7/9 City Council meeting <br /> passed without the grading/drainage plan being received. Extended time for <br /> consideration of variance to 9/27/2007. <br /> 7/17/2007 Feyos faxed landscape plan for rain garden, prepared by Frank's Landscaping <br /> and Bobcat Service. <br /> 7/23/2007 Letter from Turner to Frank's Landscaping and Bobcat Service (with copy to <br /> Feyos) indicating Amundsen had looked at Z/17 plan but it was not based on <br /> Kurth's grading plan. Directed to revised plan to reflect Kurth's plan. (7/17 plan <br /> was based on 3/5/2007 grading plan.) <br /> 8/2/2007 Letter from Turner to Feyo, containing quote from Kellogg: <br /> "The grading plan and storm drainage improvements provided were adequate for <br /> the Planning Commission to review but prior to final council approval all <br /> drainage details need to be resolved. This means that the applicant should have <br /> an engineer design and rain garden and any other associated storm sewer <br /> improvements. The final detailed design the engineer prepares should include <br /> detailed rain garden design, proposed pipes and pipe sizing and all associate <br /> supporting calculations. The proposed storm sewer improvements should be <br /> integrated into the previously approved grading plan. To date we [Bonestroo] <br /> have not received this level of detailed design and therefore we have not been <br /> able to complete a final review." <br /> Copies of Bonestroo reviews enclosed. <br /> 8/24/2007 Revised drainage plan received. <br /> 8/27/2007 Turner sent plan to Kellogg for review. <br /> 9/18/07 Review letter from Amundsen: Plan is acceptable, subject to inspection of <br /> swales, rain garden and roof drainage system by the City at time of installation <br /> 9/24/2007 Variance approved (on consent) <br /> Bill received fi�om Bonest��oo Due to change in Bonesti•oo's billing p�^ogram this <br /> .�� 4 �� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.