My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-2009 Council Work Session Packet
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2009
>
02-10-2009 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 2:23:55 PM
Creation date
7/8/2015 2:23:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Orono City Council <br /> Committee of the Whole <br /> February 10, 2009,6:15 p.m. <br /> Orono City Council Chambers <br /> Present: Mayor Jim White, Council Members Lili McMillan, Doug Franchot,Jim Murphy and Cynthia <br /> Bremer; City Administrator Bill Wells, Finance Director Ron Olson, Assistant City <br /> Administrator for Long-Term Strategy Mike Gaffron, City Clerk Lin Vee <br /> 1. Engineer's Report <br /> A. Casco Point Reconstruction Project Update <br /> • Kellogg reviewed the proposed schedule with the contract being awarded at the end of <br /> March or beginning of April. Schedule will be extended out a few weeks but will not affect <br /> construction timelines. <br /> • State allows different "best value procurement" method for one project per year per city <br /> until 2011—allows award based on low bid as well as other criteria the city determines; not <br /> obligated to take low bidder. After 2011, cities are not limited on the number of projects <br /> that use the "best value procurement" method. <br /> o Sample of criteria that could be used includes: lowest price-40%; quality-20%; <br /> timeliness-20%; performing on budget-10%, key personnel-10% <br /> o Bonestroo is working on criteria list and points for this project with Soren reviewing. <br /> o A group of 4-6 people would be selected to evaluate the bids who would also go <br /> through a short training session. <br /> • Survey results were briefly discussed. There is clearly not a majority who want to include <br /> undergrounding utilities as part of this project. <br /> • Decorative street lighting could be considered as part of the project. Some residents have <br /> installed their own light and pay the utility bill. Lights and who owns them should be <br /> identified by Xcel. City would need plans before further discussion and should also consider <br /> a city-wide policy regarding lighting. The current lighting ordinance is very minimal and <br /> doesn't address light pollution. There may not be significant cost savings to include lighting <br /> with the project rather than doing at a later time. However, residents may perceive as <br /> additional disturbance if lighting is done later and not included with project. Bonestroo will <br /> put together some lighting options and bring back to Council in 2 weeks. <br /> B. Discussion Regarding Myrtlewood Sewer/Water Project <br /> • Public hearing is scheduled for February 23. Myrtlewood neighborhood is fairly easy to <br /> review. 850 and 875 Wayzata Boulevard are bigger issues with total cost for these two <br /> properties at$350,000. The two Wayzata Boulevard property owners will probably want to <br /> discuss at the public hearing. Proposed 2" pipe for 850 Wayzata Boulevard would be <br /> sufficient for higher density use if needed in the future (25-30 units). <br /> • Water—property owners could hook up later as has been done with sewer in the past. To <br /> take advantage of the assessment over 15 years, they would have to participate in the <br /> project from the beginning. If they wait, they would have to pay the full amount when they <br /> want to hook up. A new well would be approximately$10,000. Another benefit of city <br /> water would be a closer proximity of water hydrants that often improves insurance rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.