My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-2013 Council Work Session Packet
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2013
>
09-23-2013 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2019 2:09:50 PM
Creation date
7/8/2015 1:53:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Construction Project <br /> The project scope includes the remodel of the existing space, the small additions for the Daity <br /> Operations Center and Restrooms, the new Garage, and related new site work. <br /> Existing Building, remodeled 7109 square feet. <br /> New Additions for Daily Operation Center, Restroom Expansion, 8� Support, 1,557 sf. <br /> The main building (shown in red on the plan diagram) from the point of the entering into the Police <br /> secure vestibule, we are reconfiguring the secure glass to improve the efficient use of office space. It <br /> allows the open office to move forward and reduce in overall square footage. Within the same space <br /> we can provide a separate lunch and break room or additional meeting space, and the officers have <br /> their own area now with their file and storage space and 4 common work areas for filling out reports. <br /> The print and work area and files are more accessible to staff and officers. <br /> The Interview room is made more secure from the office staff by adding a door in the walkway. <br /> Most of the offices remain unchanged, but would be helpful to refinish to allow for more small meeting <br /> use. <br /> The lockers and rest rooms needed to grow. The restrooms were undersized considering that they <br /> were shared with staff. Men's lockers, currently split on 2 levels, were integrated into the main locker <br /> restroom. A small addition was required to allow this to happen. (Area shown in blue on the plan <br /> diagram.) <br /> Also, the Sergeants office is shared by 3 people. The small addition allows for the 3�d work space. <br /> (Area shown in blue on the plan diagram.) <br /> The current Armory and Evidence rooms were inefficient and needed to be reconfigured. These <br /> functions work very nicely in the new proposed garage addition. The Evidence room is accessed from <br /> the main office close to the garage entry. <br /> The Daity Operations/Conference/Multipurpose Room is a necessary daily function, allows for morning <br /> roll call, full staff meetings, training and direct outdoor access and use of restrooms without <br /> compromise to office security. <br /> Generally, the spaces will be repainted, and ceiling tile and lighting matched. Carpet will probably be <br /> replaced, but will be evaluated. Entry tile will be replaced with the wall reconfiguration. Lockers will be <br /> new, similar in size, but better ventilating. <br /> New Garage, 8,991 square feet. <br /> The new attached garage (shown on the plan in green) is designed to house16 squad cars. Today <br /> there is sensitive equipment in these cars which currently have to be removed daily. Now the <br /> equipment can remain in the vehicle. There is comfortable but separate secured access between <br /> offices and new garage. <br /> The plan also includes space for vehicle maintenance supplies, speed trailer, bike holding area, <br /> motorcycles, etc. <br /> There will be a wash bay and hand hoses, laundry, enclosed storage, and storage for duty bags by the <br /> entry. <br /> Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.