My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 - re: procedure for sched. inspec. when they should be made
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
650 Brown Road North -34-118-23-12-0004
>
Correspondencer
>
2000 - re: procedure for sched. inspec. when they should be made
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:41 PM
Creation date
3/16/2020 8:30:43 AM
Metadata
Fields
Template:
x Address Old
House Number
650
Street Name
Brown
Street Type
Road
Street Direction
North
Address
650 Brown Road North
PIN
3411823120004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY of ORONO <br /> ,r <br /> VS% A. / Municipal Offices <br /> Mailing AddAddress:9-41,31101 / <br /> Street Address:2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: Contractor or Homeowner <br /> From: Lyle Oman, Building Official <br /> Subject: Procedure for scheduling inspections and when inspections should be made. <br /> All inspections will be made within 24 hours,upon notification by telephone or in person(612-249- <br /> 4600). <br /> • <br /> The required inspections are in order as follows: <br /> 1. Footing Inspection-to be made after the forms are in place and prior to the pouring of any <br /> concrete. All survey stakes must be marked. <br /> 2. Plumbing Inspection - after all plumbing is roughed in, 5# air test is required. <br /> 3. Septic System - see septic system installers' handout. <br /> 4. Sewer/Water Connections -to be made prior to covering any portion of connection. <br /> 5. Mechanical Inspection - after heating is roughed in. <br /> 6. Electrical Inspection-after all electrical is roughed in. Inspection and permits done by State <br /> Electrical Inspector, Michael Hawk, 612-598-1711 (office hours 7:00-8:30 a.m.). <br /> 7. Framing Inspection-to be made after inspection no.2,6,and 7 are complete,but prior to the <br /> placement of any covering material. <br /> 8. Insulation Inspection-to be made after the roof covering is completed, insulation and vapor <br /> barrier are in place, but prior to the placement of any covering material. <br /> 9. Lath and/or Wallboard Inspection - to be made after lathing and/or wallboard, interior and <br /> exterior, is in place, but before any plastering is applied or before wallboard joints and <br /> fasteners are taped and finished. <br /> 10. Final Inspection- to be made after the building is complete and prior to occupancy. <br /> X:\APPS\W P W IN60\W PDOCS\FORMS\INSPECTI <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.