Laserfiche WebLink
CITY of ORONO <br /> ,r <br /> VS% A. / Municipal Offices <br /> Mailing AddAddress:9-41,31101 / <br /> Street Address:2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> To: Contractor or Homeowner <br /> From: Lyle Oman, Building Official <br /> Subject: Procedure for scheduling inspections and when inspections should be made. <br /> All inspections will be made within 24 hours,upon notification by telephone or in person(612-249- <br /> 4600). <br /> • <br /> The required inspections are in order as follows: <br /> 1. Footing Inspection-to be made after the forms are in place and prior to the pouring of any <br /> concrete. All survey stakes must be marked. <br /> 2. Plumbing Inspection - after all plumbing is roughed in, 5# air test is required. <br /> 3. Septic System - see septic system installers' handout. <br /> 4. Sewer/Water Connections -to be made prior to covering any portion of connection. <br /> 5. Mechanical Inspection - after heating is roughed in. <br /> 6. Electrical Inspection-after all electrical is roughed in. Inspection and permits done by State <br /> Electrical Inspector, Michael Hawk, 612-598-1711 (office hours 7:00-8:30 a.m.). <br /> 7. Framing Inspection-to be made after inspection no.2,6,and 7 are complete,but prior to the <br /> placement of any covering material. <br /> 8. Insulation Inspection-to be made after the roof covering is completed, insulation and vapor <br /> barrier are in place, but prior to the placement of any covering material. <br /> 9. Lath and/or Wallboard Inspection - to be made after lathing and/or wallboard, interior and <br /> exterior, is in place, but before any plastering is applied or before wallboard joints and <br /> fasteners are taped and finished. <br /> 10. Final Inspection- to be made after the building is complete and prior to occupancy. <br /> X:\APPS\W P W IN60\W PDOCS\FORMS\INSPECTI <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />