Laserfiche WebLink
Sep 07 04 11 : 03p TOM LINDEMEIER 952 361 6918 p. 5 <br /> [ ) all penetrations between conditioned and unconditioned spaces made prior to framing inspection are sealed* <br /> Interior Air Barrier <br /> [ ) all fire stops are air sealed <br /> [ J pipes,ducts,wires,equipment and flues and chimneys through the interior air barrier are sealed <br /> [ ) a sealed continuous interior air barrier is installed on the warm side of the building envelope at ceilings,walls,and <br /> floor rim joist areas* <br /> [ J air barrier behind tub and shower is sealed and protected <br /> [ I recessed light fixtures are sealed <br /> Envelope Insulation <br /> [ ] basement insulation R-5 minimum <br /> [ ] wind wash barrier on wall separating house and garage is sealed <br /> [ ] loose fill insulation is prevented from entering the eaves <br /> [ ] insulation on skylight shafts and walls exposed in attics is supported on the unconditioned side <br /> Attic Insulation <br /> [ J attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel <br /> [ J attic card attached to framing near access opening <br /> [ ) notification of attic R-value and date of installation posted near building permit inspection card <br /> This is a summary only. Other requirements may apply. See the Minnesota Energy Code. Questions? Call the <br /> Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. <br />