My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic System Inspections
Orono
>
Property Files
>
Street Address
>
W
>
Woodhaven Drive
>
2445 Woodhaven Dr - 33-118-23-41-0010
>
Septic
>
Septic System Inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:51:18 PM
Creation date
2/24/2020 10:08:01 AM
Metadata
Fields
Template:
x Address Old
House Number
2445
Street Name
Woodhaven
Street Type
Drive
Address
2445 Woodhaven Drive
Document Type
Septic
PIN
3311823410010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> o4,. <br /> 0 0 <br /> i l CITY of ORONO <br /> W ti Municipal Offices <br /> \ . `' ' 14 , 0 <br /> t t �r,, 4 Street Address: Mailing Address: <br /> ' e880.9. 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> March 24, 2000 <br /> John and Patricia Harris <br /> 2445 Woodhaven Drive <br /> Long Lake, Mn 55356 <br /> Dear Mr. and Mrs. Harris: <br /> This is a follow up letter reminding you of what is needed in regard to your septic system. It was found <br /> to be surfacing on November 22, 1999. Orono Municipal Code requires that all failing septic systems be <br /> replaced within ninety(90) days. However,this was not feasible considering the time of the year. <br /> The septic system will need to be replaced no later than October 1,2000. The steps to replacing the septic <br /> system are as follows: <br /> 1. Contact a state licensed site evaluator (list enclosed) to design a septic system <br /> for your property. <br /> 2. Submit the plans to the City for review and approval. <br /> 3. Contact a septic contractor(list enclosed)to install the septic system. The <br /> contractor will obtain all permits from the City and set up the required <br /> inspections. <br /> Until the septic system is installed,the septic tanks must be pumped before they are full to stop the surface <br /> discharge. <br /> Do not hesitate to contact me at the City Offices at 249-4600 if you have any questions regarding the <br /> situation. <br /> Cs ectfu , <br /> 41.0 Ail <br /> .s Pen e <br /> On-Site Systems Manager <br /> enclosures <br /> Telephone(612)249-4600 • Fax(612)249-4616 <br />
The URL can be used to link to this page
Your browser does not support the video tag.