My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 - 00258 - new structure
Orono
>
Property Files
>
Street Address
>
W
>
Wood Duck Trail
>
2895 Wood Duck Trail - 33-118-23-24-0031
>
Permits/Inspections
>
2018 - 00258 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:51 PM
Creation date
2/24/2020 8:41:04 AM
Metadata
Fields
Template:
x Address Old
House Number
2895
Street Name
Wood Duck
Street Type
Trail
Address
2895 Wood Duck Trail
Document Type
Permits/Inspections
PIN
3311823240031
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
View images
View plain text
the development grading work in Pond 1 including Item 4 below. Also The retaining wall that is shown on that lot in <br /> the development grading plan is not yet built. <br /> The building permit grading plan does show both proposed grades along the pond and the retaining wall as proposed, <br /> however these are both development level improvements that should be completed prior to the lot <br /> Can you confirm your plans in the area? I'm leery to approve this plan if the development work is not complete. <br /> Adam <br /> Adam T. Edwards, P.E. <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 <br /> aedwards@ci.orono.mn.us <br /> From:Art Taylor [mailto:artta@bolton-menk.com] <br /> Sent:Thursday, October 26, 2017 3:30 PM <br /> To: 'Stephanie Griffin' <steph.griffin@excelsiorllc.com> <br /> Cc:Adam Edwards<aedwards@ci.orono.mn.us>; David P. Martini<davidma@bolton-menk.com>; Brian Simmons <br /> <briansi@bolton-menk.com>;Scott Oberaigner<SOberaigner@ci.orono.mn.us>; David Goman <br /> <dgoman@ci.orono.mn.us> <br /> Subject: Orono-Orono Preserve Walkthrough 18Oct17 <br /> Stephanie, <br /> With respect to item number 7 on the below list, I discussed this with Adam Edwards today. The fire hydrant <br /> and gate valve at Stat 3+64.40 need to be relocated with the gate valve behind the curb and the fire hydrant 3'from the <br /> gate valve. The other work under consideration will wait until future expansion of the system dictates a need. <br /> The work to re-locate the fire hydrant and gate valve may wait until next year prior to placement of the wear <br /> course as there will most likely be curb to be replaced as well. <br /> Thanks, <br /> art <br /> Stephanie, <br /> I dug through Shane's field notes, that 8"watermain extension has a "top of pipe" elevation shot in the field of <br /> 1021.00,the elevation is noted where the watermain extension comes up to Old Crystal Bay Road,this might help with <br /> the As Builts. That and exposing the 8" gate valve at the intersection of Goldenrod Way and Sandhi!! Drive should prove <br /> helpful. <br /> Adam Edwards, Scott Oberaigner, DJ Goman and myself met on site this morning for a walkthrough of the <br /> project. As you are well aware,Winter is on its way and we wanted to give you time to respond and take care of things <br /> before snow flies. Due to the dirt on the street throughout the project and the fact that the Wimcos are in place in all <br /> catch basins,we elected to not inspect the structures until next year after things thaw,the structures are sealed for now <br /> and we did not wish to disturb things, possibly getting more sediments and material into both the storm sewer and the <br /> sanitary sewer. The following are items that need to be addressed or at the very least, discussions had,to expedite <br /> things and provide some answers. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).