My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014 - 00702 - septic new
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2360 Willow Hill Drive - 03-117-23-23-0023
>
Permits/Inspections
>
2014 - 00702 - septic new
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:43 PM
Creation date
2/13/2020 9:47:47 AM
Metadata
Fields
Template:
x Address Old
House Number
2360
Street Name
Willow Hill
Street Type
Drive
Address
2360 Willow Hill Dr
Document Type
Permits/Inspections
PIN
0311723230023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Design Summary Worksheet UNIVERSITY - <br /> Minntsota Pollution OF MINNESOTA <br /> Control Agency <br /> Mound Design Summary <br /> Absorption Area 625.0 ft2 Bed Length 63.0 ft Bed Width 10.0 ft <br /> Absorption Width 12.0 ft Clean Sand Lift 1.0 ft Berm Width (0-1%) ft <br /> Upslope Berm Width 11.0 ft Downslope Berm Width 15.0 ft Endslope Berm Width 10.0 ft <br /> Total System Length 83.0 ft Total System Width 36.0 ft Contour Loading Rate 12.0 gal/ft <br /> At-Grade Design Summary <br /> Absorption Bed Width ft Absorption Bed Length ft System Height ft <br /> Contour Loading Rate gal/ft Upslope Berm Width ft Downslope Berm Width ft <br /> Endslope Berm Width ft System Length ft System Width ft <br /> Level 8:Equal Pressure Distribution Summary <br /> No.of Perforated Laterals 3 Perforation Spacing 3 ft Perforation Diameter 7/32 in <br /> Lateral Diameter 2.00 in Min. Delivered Volume 0 gal Maximum Delivered Volume 188 gal <br /> Non-Level and Unequal Pressure Distribution Summary <br /> Elevation Pipe Volume Pipe Length Perforation Size <br /> (ft) Pipe Size(in) (gal/ft) (ft) (in) Spacing(ft) Spacing(in) <br /> Lateral 1 Minimum Delivered Volume <br /> Lateral 2 gat <br /> Lateral 3 <br /> Lateral 4 Maximum Delivered Volume <br /> Lateral 5 gal <br /> Lateral 6 <br /> 5. Additional Info for Type IV/Pretreatment Design <br /> A. Calculate the organic loading using option I or 2 <br /> 1. Organic Loading =Pounds of BOO X Units <br /> lbs/day X lbs BOD/day <br /> 2. Organic Loading to Pretreatment Unit =Design Flow X Estimated BOO in mg/L in the effluent X 8.35+1,000,000 <br /> gpd X mg/L X 8.35+1,000,000= lbs BOD/day <br /> B. Type of Pretreatment Unit Being Installed: <br /> C. Calculate Soil Treatment System Organic Loading: lbs.BOD/day+Bottom Area =lbs/day/ft2 <br /> lbs/day+ ft2= lbs/day/ft2 <br /> Comments/Special Design Considerations: <br /> I hereby certify that I have Completed this work in accordance with all applicable ordinances,rules and laws. <br /> Joseph J Olson 810 02/04/14 <br /> (Designer) (Signature) (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.