My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013 - 00685 - septic
Orono
>
Property Files
>
Street Address
>
W
>
Willow Hill Drive
>
2325 Willow Hill Dr - 03-117-23-23-0022
>
Septic
>
2013 - 00685 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:35:40 PM
Creation date
2/13/2020 8:58:06 AM
Metadata
Fields
Template:
x Address Old
House Number
2325
Street Name
Willow Hill
Street Type
Drive
Address
2325 Willow Hill Dr
Document Type
Septic
PIN
0311723230022
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Design <br /> Minnesota Pollution UNIVERSITY <br /> Worksheet > 1% Slope OF MINNESOTA <br /> Control Agency <br /> 1. SYSTEM SIZING: v 11.05.31 <br /> A. Design Flow(Flow ft Soil- 1.A) : 750 GPD Table I <br /> MOUND CONTOUR LOADING RATES: <br /> B. Soil Loading Rate(Flow ft Soil-3.C): 0.60 GPD/ft2 measured Texture-derived <br /> Contour <br /> Porc Rate OR mound absorption ratio Loading <br /> C. Depth to Limiting Condition: 2.3 ft Rate: <br /> D. Percent Land Slope: 4.0 % ;60mpi 1.0, 1.3.2.0.2.-1,2.6 • :12 <br /> E. Design Media Loading Rate: 1.2 GPD/ft2 61-120 mpi OR 5.0 • :12 <br /> F. Mound Absorption Ratio(Table IXa): 2.00 120 nlpi' -5.0' :6' <br /> G. Design Contour Loading Rate: 12.0 GPD/ft <br /> 'Systems with these values are not Type I systems. <br /> (From Table I -same as Linear Loading Rate) Contour Loading Rate is a recommended value. <br /> 2. DISPERSAL MEDIA SIZING <br /> A. Calculate Required Dispersal Bed Area:Design Flow (1.A):Design Media Loading Rate (1.E)=ft2 <br /> If a larger dispersal media 750 GPD-:- 1.20 GPD/ft2 = 625 ft2 <br /> area is desired,enter size: 630 ft2 <br /> B. Calculate Dispersal Bed Width: Contour Loading Rate (1.G):Design Media Loading Rate (1.E)=Bed Width <br /> 12.0 ft _ 1.2 gpd/ft2 = 10 ft <br /> C. Calculate Dispersal Bed Length: Dispersal Bed Area (2.A)+Bed Width (2.B)=Bed Length <br /> 630 ft2 : 10 ft = 63 ft <br /> D. Select Dispersal Media: El Rock <br /> ❑Other Approved Media <br /> 3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks are measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.B)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft x 2.0 = 20.0 ft <br /> B. For slopes>1%, the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Calculate Downslope Absorption Width:Absorption Width (3.A) -Bed Width (2.B)=ft <br /> 20.0 ft - 10.0 ft = 10.0 ft <br /> Comments: <br /> Slope, CLR Choice,Material issues <br />
The URL can be used to link to this page
Your browser does not support the video tag.