Laserfiche WebLink
OSTP Mound Materials Worksheet UNIVERSITY 7 „. <br /> Minnesota Pollution OE MINNESOTA <br /> Control Agency �~ <br /> Project ID: v 12.08.06 <br /> A. Calculate Bed (rock)Volume:Bed Length (2.C)X Bed Width (2.6)X Depth =Volume (ft3) <br /> 63.0 ft X 10.0 ft X 1.0 = 630.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: <br /> 630.0 ft3 t 27 = 23.3 yd3 <br /> Add 20%for constructability: 23.3 yd3 X 1.2 = 28.0 yd3 <br /> B. Calculate Clean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Media Length =cubic feet <br /> 2.0 ft X 10.0 ft X 63.0 ft = 1270.5 ft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Total Clean Sand Volume: Volume from Length+Volume from Width+Volume Under Media <br /> ft3 + ft3 + ft3 = ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)*2=cubic feet <br /> (( 3.7 ft -1) X 3.0 ft X 63.0 )-2= 252.0 ft3 <br /> Downslope Volume:((Downslope Height- 1) x Downslope Absorption Width x Media Length)*2=cubic feet <br /> (( 4.4 ft-1) X 10.0 ft X 63.0 ),2,- 1060.5 ft3 <br /> Endslope Volume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.4 ft-1 ) X 3.0 ft X 10.0 ft = 101.0 ft3 <br /> Total Clean Sand Volume:Upslope Volume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 252.0 ft3 + 1060.5 ft' + 101.0 ft3 + 1270.5 ft3= 2684.0 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 2684.0 ft3 s 27 = 99.4 yd3 <br /> Add 20%for constructability: 99.4 yd3 X 1.2 = 119.3 yd3 <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)*2=cubic feet <br /> ( 4.0 - 0.5 )ft X 44.8 ft X 89.2 )*2= 7028.5 ft3 <br /> Total Mound Volume-Clean Sand volume-Rock Volume=cubic feet <br /> 7028.5 ft3 - 2684.0 ft3 - 630.0 ft3 = 3714.5 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 3714.5 ft3 : 27 = 137.6 yd3 <br /> Add 20%for constructability: 137.6 yd3 x 1.2 = 165.1 yd3 <br /> D. Calculate Topsoil Material Volume:Total Mound Width X Total Mound Length X.5 ft <br /> 44.8 ft X 89.2 ft X 0.5 ft = 1998.6 ft3 <br /> Divide ft3 by 27 ft3/yd3 to calculate cubic yards: 1998.6 ft3 _ 27 = 74.0 yd3 <br /> Add 20%for constructability: 74.0 yd3 x 1.2 = 88.8 yd3 <br />