My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic System Approval
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1180 Willow Dr N - 27-118-23-32-0003
>
Septic
>
Septic System Approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:03 PM
Creation date
2/11/2020 11:39:56 AM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1180 Willow Drive North
Document Type
Septic
PIN
2711823320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-17 <br /> PUMP SELECTION PROCEDURE <br /> END PERFORATION Of A PERFORATED LATERAL <br /> A. Determine pump capacity: &W C_ <br /> Gravity Distribution ,....,, <br /> 1. Minimum suggested is 600 gallons per hour(10 m)to stay ahead of <br /> Water use Tate. <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 ��^R}61s..H..,�ar,s." <br /> �tiw�... t« <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. 1 I: Etta- <br /> gallons <br /> �«�u,« <br /> Pw%,WI.N L�tin at <br /> Pressure DLstibution Cieft Sow RAV• ei""" "' <br /> 3.a. Select number of perforated laterals 3 <br /> b. Select perforation spacing=,�_feet. �P%"" L„'"""' <br /> C. Subtract 2 ft.from the rock layer length. <br /> 14-el�um 610-2 ft.- feet. <br /> d. Determine the number of spaces between perforations. <br /> Length perf.spacing=_ML ft.+ --t, ,ft.= z spaces Requymd pa fos,tion Dom, e <br /> e. )3 spaces+1=_ V perforations/lateral h+8Bons per n-Ante <br /> f. Multiply perforations per lateral by number of laterals to1 f y 41 A 'H.'.adr'a ;2 1646 Patti mo PW <br /> get total number of perforations. 1tl-" x -�,= L � perforations.In Ll til <br /> g. x °'` -U-spnL 1.0a 0.56 0.74 <br /> SELEC TED PUMP CAPACITY gpm 2.Ob 0.80 1.04 <br /> B.Determine head requirements: a. Use for single family homes <br /> 1. Elevation difference between pump and point of discharge. b.Use for all other applications <br /> 4 feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity system,zero. <br /> A_feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. Point of Discharge <br /> F.L._ ), j� ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Elevation Diffemncel <br /> point. Add 25 percent to pipe length for fitting ]P=p g3 <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> - e?O _x 1.25= q 15! feet 1gpM .5 inch 2.0 inch 3.0 inch <br /> c. Calculate total friction loss by multiplying Friuk iI=va 100n,fPipc <br /> friction loss in ft/100 ft by equivalen pipe length. 10 <br /> Total friction loss- )_x_�+100=�_feet 10 0.69 0.20 <br /> 12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> q + 6, +�_ 25 3.73 1.11 0.16 <br /> (1) (2) (3c) 30. 5.23 1.59._. 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 2.64 0.39 <br /> TOTAL HEAD .� feet 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> 3 _gpm (Step A) with at least Y feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.