My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic System Approval
Orono
>
Property Files
>
Street Address
>
W
>
Willow Drive North
>
1180 Willow Dr N - 27-118-23-32-0003
>
Septic
>
Septic System Approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:03 PM
Creation date
2/11/2020 11:39:56 AM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Willow
Street Type
Drive
Street Direction
North
Address
1180 Willow Drive North
Document Type
Septic
PIN
2711823320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. DOWNSLOPE I?PM WIDTH <br /> I. If landslope is�6 �more,subtract rock layer width from <br /> adsorption width to obtain minimum downslope dike toe <br /> p.L.7 ft-jpft =__feet <br /> 2. Calculate Minimum.mound size based on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock <br /> layer: Separation 1,_l feet <br /> t b. Multiply rock layer width by landslopeto determine drop in elevation; teel RD ed <br /> Slope Differencejx 2 %i100=_-feet Slope Oltference -!-z- et <br /> uvslooe width <br /> c. Add depth of clean sand for separation (2a) -1 feet Rock Bed width <br /> at upslope edge,depth of rock layer(1 foot) to depth of _A2-feet Downslope width <br /> cover(1 foot) to find the mound height at the upslope edge -�- feet <br /> of rock layer; <br /> 1,,�_ft+ ift + ift= ,feet <br /> d. Enter table with landslope and upslope dike ratio. <br /> Select dike multiplier of 3.5O <br /> e. Multiply dike multiplier by upslope mound height <br /> to find upslope dike width: ,t x 3„tZ =_I feet <br /> f. Add depth of clean sand for slope difference (2b) at <br /> downslope edge,to the mound height at the upslope edge <br /> of rock layer (20 to find the downslope height; <br /> ,LL ft+i ft= .3. e feet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of 4,S4-- <br /> h. Multiply dike multiplier by downslope mound height <br /> to get downslope dike width: NSA x 2. _ j2 feet <br /> i. Compare the values of step G.1 and Step G.2h Select the <br /> greater of the two values as the downslope dike width; <br /> i feet <br /> j. Total mound width is the sum of < '< - foot , ,a <br /> upslope dike (G-2e)width plus rock <br /> Yy�3 $,fix}. ..._. 'OROCK •°wlotn ,. <br /> layer width (D.2)plus C uosloD•w din lost uoelo9e rr of <br /> downslope dike width(G.2i); 3 - "" toot <br /> 0 <br /> 1,3 ft + loft + _ft = 140 feet , <br /> k. Total mound length is the sum of 40 oownslooe width <br /> JZ tset ; <br /> upslope dike width (G.2e) plus rock layer <br /> length (D.3) plus upslope dike width (G.2e); <br /> 13-ft + _�lLft+eft= �2_ feet :. ' . <br /> !� + 41 - <br /> Total Length <br /> Vownslope tj Pslope <br /> 3:1 l•1 5:1 lid 7:1 3:1 4:1 5:1 6.1 7:1 8:1 <br /> x <br /> 0 3.0 40 SA 6A 7.0 3.0 4.0 S.0 4.0 7.0 8.0 <br /> 1 30 L17 526 618 733 2.91 3.85 4.76 SAS 654 7A1 <br /> 2 3.19 435 536 4A2 514 2.51 3.70 434 S36 4.14 6.90 <br /> 3 310 �7 5.88 732 8.86 275 C3435 50 5.79 6AS <br /> 4 _3 _.�_ .__.70 972 268 3.t5 4.17 4.84 5.46 6,06 <br /> 13M 500 La 837 10.77 261 331 4.00 4.62 5.19 S71 <br /> 6 3,66 Std 7.14 938 12.07 234 321 3.55 4.41 4.93 SAI <br /> 7 3,110 556 7.69 1034 1371 2.48 3.12 3.70 421 4.70 5.13 <br /> 13A SAS L33 11.64 1531 142 1.01 337 4.055 4.49 4.88 <br /> 9 411 62.5 90 13A4 IL92 236 1% 3.45 3.90 430 4,65 <br /> 10 429 667 10.0 15.00 2333 231 186 333 3.75 4.12 4A4 <br /> 11 4A8 7.14 11.11 VAS 30A3 226 178 313 3.61 3.95 426 <br /> 12 4A9 7.69 1230 21A3 4375 1 121 170 3.12 3.49 3.80 4.06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.