Laserfiche WebLink
State Farm <br /> 23-29W 8-533 <br /> HYL1rN,PATTT <br /> General Contractor O&P Items Quantity Unit Price Total Cost <br /> - _. _.- _- a <br /> Labor: <br /> 554,56 <br /> FINISH CARPENTRY I TRIM-WORK Subtotal: 559.51 <br /> INSULATION <br /> Material 426.69 SF 0.520 221.88 <br /> Insulation-R-19 unfaced batt <br /> Material: 221.88 <br /> Contractor Labor- 2.36 HR 44.400 104,89 <br /> * <br /> Demolition Laborer 2.00 HR 52.410 104.89* <br /> Insulation Installer <br /> Labor: 209.78 <br /> INSULATION Subtotal: 431.66 <br /> LIGHT FIXTURES <br /> Contractor Labor 1.62 HR 96.910 156.76* <br /> Electrician <br /> Labor: 156.76 <br /> Miscellaneous: 7.48 <br /> LIGHT FIXTURES Subtotal: 164.24 <br /> PANELING&WOOD WALL FINISHES <br /> Material- LB 2.330 6.59 <br /> 1 <br /> 6d finish nails(based on 5 lb box) 2.83 <br /> Construction adhesive 474.79 9 LTFB 3 33 3826.8200 6.82 <br /> 1.750 <br /> T&G paneling-bullnose(rounded joints)-softwood- 1" <br /> Material: 843.15 <br /> Contractor Labor- <br /> Carpenter-Finish,Trim/Cabinet 13.93 HR 68.950 960,14* <br /> Demolition Laborer <br /> 3.09 HR 44.400 137.16* <br /> Labor: 1,097.30 <br /> PANELING&WOOD WALL FINISHES Subtotal: 1,940.45 <br /> PAINTING <br /> Material- 0.08 GL 17.480 1.46* <br /> Painter's putty 1.43 SH 0.529 0.76 <br /> 160- 180 grit sandpaper-per sheet 63.770 11.76" <br /> Plastic,2 mil-9'x 400'roll 0.19 RL <br /> Masking paper,12"roll 0.41 RL 4.290 1.78* <br /> * <br /> Masking tape,3/4"roll 0.41 RL 3.640 <br /> 0.61 GL 31.500 19.15* <br /> Oil base stain 10 5�,4 5,61 <br /> Paint thinner(mineral spirits) 0.53 GL <br /> Polyurethane finish 2.13 GL 40,990 87.21* <br /> Latex paint 1.65 GL 32.697 54.00* <br /> PVA-latex drywall primer/sealer <br /> 1.61 GL 15.130 24.30' <br /> Material: 207.67 <br /> Contractor Labor- g4 b70 675.57* <br /> Painter 12,.36 HR <br /> Labor: 675.57 <br /> Page: 13 <br /> Date: 3/25/2014 10.29 AM <br /> 6 1, abed EE9Z-LZ17-E9L Xed dH Nd0510 1710Z 91 Jdd <br />